Sec. 30-145. - Transporting and placing asphaltic concrete hot mix wearing surface.
(a) The methods employed in performing the placement of asphaltic concrete hot mix wearing surface and all equipment, tools and machinery used in handling materials and in executing any part of the work, shall be subject to the approval of the owner's engineer before the work is started, and whenever found unsatisfactory, shall be changed or improved as required by the owner's engineer. (b) The mixture shall be transported from the paving plant to the work in tight vehicles with metal bottoms, previously cleaned of all foreign substances, and lightly lubricated with a thin oil or soap solution. Excessive lubricant will not be permitted. When directed by the owner's engineer, the vehicles shall be suitably insulated, and each load shall be covered with a canvas or other suitable material. Care shall be exercised by truck drivers so as not to disturb or loosen the prepared base course when entering or leaving the project area. (c) The mixture shall be laid only upon a base which is dry, or at least free from standing water, and only when weather conditions are suitable and the mixture shall have a temperature range of from two hundred seventy-five (275) degrees Fahrenheit to three hundred twenty-five (325) degrees Fahrenheit. Prior to the delivery of the mixture on the work, the prepared base shall be cleaned of all loose or foreign material. No asphaltic concrete material shall be mixed or placed when a descending air temperature reaches forty (40) degrees Fahrenheit, or shall not be started until an ascending air temperature reaches thirty-five (35) degrees Fahrenheit. (d) All asphaltic concrete mixture shall be unloaded into a mechanical, self-powered paver which is capable of spreading the mixture true to the line, grade, and crown set by the owner's engineer. Care shall be exercised to ensure the mixture being unloaded into the mechanical paver so that no material will fall between the truck and the paver onto the prepared base course. Such deposits shall be removed immediately. Hand spreading shall be allowed in areas inaccessible to the paving machine, and/or such areas as directed by the owner's engineer. The laying process shall be continuous as nearly as is practicable. Care shall be exercised by the contractor not to destroy or loosen the base course material during the laying operations. (e) The asphaltic concrete mixture shall be compressed while in a plastic condition and as soon after being raked as it will bear the rollers without undue displacement or haircracking. All rollers used shall be an approved type in the eight-ton to twelve-ton class, self-propelled, and in good condition. Each roller shall be manned by a competent, experienced operator, and shall be kept in continuous operation as nearly as is practicable. The rolling surface of the wheels shall be properly moistened with water, but an excess of such moisture will not be permitted. Along curbs, headers, and similar structures, and all places not accessible to the roller, the surface mixture shall be thoroughly compacted with hot tampers to produce sealed joints. (f) The roller shall pass over the unprotected and freshly laid mixture when laying of the course is to be discontinued for such length of time as to permit the mixture to become chilled. In all such cases, provision shall be made for a proper bond with new surface mixture by cutting back the joint so as to expose an unsealed, granular surface for the full specified depth of the course. The exposed edge of the cut joint shall be painted with a thin coat of hot asphaltic cement, cut-back or emulsified asphalt and the hot mixture shall be raked against the joint, thoroughly tamped with hot tampers, and rolled. Hot smoothing irons may be used for sealing joints, but in such cases extreme care shall be exercised to avoid burning the surface. (g) Before the completion of rolling, the surface shall be tested for thickness and contour and corrected as necessary while still hot by properly adding or removing material, and by reshaping and rerolling until the finished surface complies with the best requirements. The finished surface shall show no deviation from the general surface in excess of one-sixteenth inch per foot. Ordinates measured from the face of a ten-foot straight-edge to the surface of the pavement shall not exceed one-sixteenth inch per foot in distance from the nearer point of contact, with the further provision that the maximum variation in ten (10) feet shall not exceed one-fourth inch. Such portions of the completed surface course found defective in compression or finish shall be removed and replaced with suitable material by the contractor.
(Code 1961, § 36-15(B)(5))