10.02.170 - Compliance inspection; access required; acceptance of permit conditions.
(a) The city engineer may inspect, as often as he deems necessary, every main-line sewer, building sewer, sewer lateral, trunk sewer, sewage pumping plant, industrial wastewater pretreatment devices or facilities, sewer connection, interceptor, or other similar appurtenances to ascertain whether such facilities are maintained and operated in accordance with the provisions of this chapter. All persons shall permit and provide the city engineer with access to all such facilities at reasonable times.
(b) An applicant, by accepting a permit issued pursuant to this chapter, consents and agrees to entry by the city engineer upon the premises described in the permit at all reasonable times for the purposes of:
(1) Inspection, sampling, flow measurement or examination of records;
(2) Placing on the premises devices for monitoring, flow measurement or metering;
(3) Inspecting and copying any records, reports, test results or other information required to carry out the provisions of this chapter; and
(4) Photographing any waste, waste container, vehicle, waste treatment process, discharge location, or violation discovered during an inspection
(Ord. No. 2363, § 3, 3-21-17)