§ 23-425 — Siting permits required; pre-application review

Code of Ordinances of the City of Huntsville, Alabama (Supp. No. 30 (codified through Ord. No. 26-196, adopted March 12, 2026) with enacted ordinances through Ord. No. 26-837 (September 24, 2026) applied from official council minutes and ordinance copies) · Huntsville Code of Ordinances § 23-425

Corpus is an independent public-information project, not the official City of Huntsville website. Stable reference: corpuslaw.us/code/a26edffb-2c86-4bea-89fd-489dbf532278

Sec. 23-425. - Siting permits required; pre-application review.

(a) Requirement. (1) Before a grantee who holds a valid license issued under this division can install a small cell facility or support structure in the right-of-way the grantee shall apply with the franchise manager for a siting permit for each proposed location, pay the required fees, and obtain a siting permit, except as otherwise provided in this division. The franchise manager will review and administratively process an application in accordance with this division to determine if the application is complete and consistent with this division, the license issued under this division, and applicable codes and whether a siting permit for the small cell facilities or support structure should be issued for the location in the manner requested by the applicant, consistent with this division and applicable laws. The permitting process will be administrative and not require the approval of the city council, unless otherwise provided in this division. (2) A siting permit application must be submitted for each small cell facility or new support structure on a form, paper or electronic, provided by the city. If the applicant has a good faith belief that any information submitted is proprietary or confidential, then the applicant must mark each page accordingly. An application packet will be maintained by the franchise manager. (3) The burden of proof shall at all times be on the applicant or grantee to establish compliance with requirements under this division and applicable law. (b) When siting permit not required. Subject to section 23-354 of division 2 concerning construction approval of the city engineer and to applicable code requirements, a siting permit and the one-time application fee shall not be required for small cell facilities and support structures that have already received a siting permit in the following instances: (1) For routine maintenance or repairs. (2) For modifications that do not appreciably change position, characteristic, size, or appearance of the existing facility, unless such change would violate a provision of this division, the license, or the siting permit. (c) Emergency. Where a facility has been installed without a siting permit due to an emergency, a siting permit shall be required after-the-fact within ten days if a siting permit would have originally been required to perform the work undertaken in the right-of-way in connection with the emergency. Once the emergency is abated, the small cell facilities in question must be removed unless siting permitted without the emergency as a basis for the siting permit. (d) Inspection. In addition to any inspections that may be required in connection with building and electrical permitting, the city reserves the right to inspect all small cell facility or support structure work to ensure compliance with this division, including applicable siting permits. Upon completion of a facility or support structure installation, the applicant or grantee shall provide a written notice and certification of compliance, as required by the franchise manager, that the facilities or support structure were constructed in accordance with the approved specifications. No operation at the facility shall occur unless the franchise manager, should he elect to do so, has conducted a final inspection and issued a certificate of completion, provided that if the franchise manager elects not to inspect the site, the certificate of completion will be deemed issued within 14 days of the applicant's submission of its notice and certification of compliance, or upon any required final inspections and approvals required under applicable building and electrical permitting, whichever is later. (e) Pre-application review. Prior to the submission of an application, the applicant is encouraged to have a voluntary pre-application meeting with the franchise manager to review preliminary documents and graphic exhibits of the proposed facilities or support structure and discuss the application, location, and design requirements for the proposed facilities. The primary purposes of the review are to streamline application processing and reduce site plan and design revisions, as well as the multiple reviews associated therewith. Any applicant desiring a pre-application review will agree in writing that the applicable timeline for application review, as set forth in section 23-431, will be tolled during such review period.

(Ord. No. 20-270, § 1, 4-9-2020)