For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5-638 — Duties and responsibilities of the floodplain administrator

Code of Ordinances of the City of Montgomery, Alabama (Supp. No. 27: codified through Ordinance No. 4-2026, enacted March 5, 2026) · Montgomery City Code § 5-638

Corpus is an independent public-information project, not the official City of Montgomery website. Stable reference: corpuslaw.us/code/a2b1e1b2-ccff-4d91-ac62-57299ff72ee8

Sec. 5-638. - Duties and responsibilities of the floodplain administrator.

The floodplain administrator and his/her designated staff is hereby authorized and directed to enforce the provisions of this article. The floodplain administrator is further authorized to render interpretations of this article, which are consistent with its spirit and purpose. Duties of the floodplain administrator shall include, but shall not be limited to: (1) Require permits for all proposed construction or other development in the community, including the placement of manufactured homes, so that it may be determined whether such construction or other development is proposed within flood-prone areas. Ensure the public is aware that floodplain development permits are required for development in SFHAs. (2) Conduct regular inspections of the community's SFHAs for any unpermitted development and issue stop work orders and notice of violations for any such development. Any unpermitted structure or non-structural development in the SFHA will be considered a violation until such time that the violation has been remedied. (3) Review proposed development to assure that all necessary permits have been received from those governmental agencies from which approval is required by federal or state law, including section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1334. Maintain such permits permanently with floodplain development permit file. (4) Review all permit applications of proposed development, to determine whether the proposed construction or other development will be reasonably safe from flooding and to assure compliance with this article. a. If the provisions of this article have been met, approve the permit. b. If the provisions of this article have not been met, request that either corrections and accurate completion of the application be made or disapprove the permit. (5) When BFE data or floodway data have not been provided in accordance with division 2, section 5-617 then the floodplain administrator shall obtain, review and reasonably utilize any BFE and flood way data available from a federal, state, or other sources in order to administer the provisions of division 4. (6) Verify and record the actual elevation of the lowest floor, in relation to mean sea level (or highest adjacent grade), including basement, of all new construction or substantially improved residential structures in accordance with division 3, subsection 5-637(2). a. Review elevation certificates and require incomplete or incorrect certificates to be corrected and resubmitted for approval. b. Review elevation certificate once slab is poured prior to additional construction taking place. c. A post-construction elevation certificate is required to be kept with the permit and certificate of occupancy in perpetuity; a pre-construction elevation certificate can be used to ensure the correct elevation for the lowest floor and machinery along with the correct number of vents that will be used. (7) Verify and record the actual elevation, in relation to mean sea level to which any new or substantially improved non-residential structures have been elevated or floodproofed, in accordance with division 3, section 5-637, or division 4, subsections 5-652(2) and 5-655(2). (8) When floodproofing is utilized for a non-residential structure, the floodplain administrator shall obtain certification of design criteria from a professional engineer, licensed to practice in the State of Alabama, or licensed architect, registered to practice in the State of Alabama, in accordance with division 3, subsection 5-637(1) and division 4, subsections 5-652(2) or 5-655(2). (9) Notify adjacent communities and the Alabama Department of Environmental Management and the appropriate district office of the U.S. Army Corps of Engineers prior to any alteration or relocation of a watercourse. Submit evidence of such notification to FEMA and the NFIP State Coordinator's Office (Alabama Department of Economic and Community Affairs, Office of Water Resources). (10) For any altered or relocated watercourse, submit engineering data/analysis within six months after completion of the project to FEMA and state to ensure accuracy of community flood maps through the letter of map revision process. Assure flood carrying capacity of any altered or relocated watercourse is maintained following completion of the project, (11) Where interpretation is needed as to the exact location of boundaries of the SFHA (for example, where there appears to be a conflict between a mapped boundary and actual field conditions), the floodplain administrator shall make the necessary interpretation. Any person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this article. (12) All records pertaining to the provisions of this article shall be maintained, in perpetuity, at the office of the floodplain administrator/building inspections and shall be available for public inspection when requested. (13) The floodplain administrator shall review all permit applications for improvements to existing structures in the SFHAs to determine whether such improvements constitute a substantial improvement as defined in section 5-605 of this article and in accordance with 44 CFR § 59.1. a. If the proposed work constitutes a substantial improvement, the structure must be brought into compliance with the provisions of this article for new construction b. The floodplain administrator shall maintain a permanent record of all substantial improvement determinations, including the method used to calculate improvement costs and the market value determination c. The City of Montgomery adopts a cumulative substantial improvement standard. All improvement made to a structure over a rolling ten-year period shall be combined for the purpose of determining whether the structure meets the definition of substantial improvement. (14) For any residential and nonresidential structures located in the SFHAs that are damaged from any source, natural hazard or man-made, conduct substantial damage (SD) (as defined in section 5-605 of this article) assessments. a. The floodplain administrator shall ensure that permits are obtained, in accordance with this article, prior to any repairs commencing. b. Make SD determinations whenever structures within the SFHA area are damaged by any cause or origin. SD determinations shall not be waived to expedite the rebuilding process during a post-disaster recovery or for any other reason. SD determinations shall be performed using FEMA-approved methods. c. If the community has a large number of buildings in their SFHA that have been damaged, they should decide in advance how best to handle permitting and inspecting damaged buildings for substantial damage determinations. d. If required, a moratorium may be placed on all non-disaster related construction permits until the community has sufficiently completed its SD determinations, e. The SD determinations should be performed promptly after the damage-causing event using reasonable, consistent, and defensible methods. f. The community shall utilize FEMAs' methods and tools for collecting building data and performing analyses that will provide reasonable and defensible SD determinations. Those tools shall be capable of generating reports for record-keeping purposes and to provide to the applicable property owners if requested. g. Maintain a record of the SD calculations within permit files in accordance with division 3, subsection 5-637(3)(e). h. If the SD determination finds that the extent that the cost of restoring the structure to its before damaged condition would equal or exceed 50 percent of the market value of the structure before the damage occurred, the floodplain administrator shall: 1. Coordinate with the property owner and issue a letter to convey the SD determination. 2. Determine if the damage was caused by flooding and include the cause in the letter to the property owner. Also, include whether or not the structure qualifies as a repetitive loss structure per the definitions in section 5-605 of this article. The information can be used to determine if the claim is eligible for an increased cost of compliance claim. 3. Coordinate with property owners and insurance companies for any NFIP claims. 4. If the repairs are to proceed, coordinate with the permit applicant to ensure a permit is obtained and inspections are conducted to ensure that all applicable provisions of this article are adhered to without exception or waiver. For purposes of substantial damage determinations, "market value" of the structure shall be determined using one of the following FEMA-accepted methods: (i) an independent professional appraisal by a state-licensed appraiser; (ii) the property's tax assessment value adjusted to approximate market value; or (iii) the cost approach, using FEMA-approved building cost estimating guides. Market value shall not include the value of land, accessory structures, or landscaping i. Ensure that phased improvements and incremental repairs do not circumvent the SI/SD requirements. j. Ensure that any combinations of elective improvements being made in addition to the necessary repairs to damages are included in making the SI/SD determination. k. An applicant for a permit may appeal a decision, order, or determination that was made by the local official for the following: 1. The local official's finding or determination that the proposed work constituting a SI/SD were based on insufficient information, errors, or repair/improvement costs that should be included and/or excluded; 2. The local official's finding or determination that the proposed work constituting a SI/SD were based on inappropriate valuations of costs for the proposed work, or an inappropriate method to determine the market value of the building. l. It is not appropriate for a permit applicant to seek an appeal who wishes to build in a manner that is contrary to the regulations and codes included in this article. In those cases, the applicant should seek a variance. m. Ensure that any building located in a floodway that constitutes a SI/SD has an engineering analysis performed in accordance with division 4, subsection 5-653(2). If that analysis indicates any increase in the BFE, the local official must not allow the proposed work unless the structure is brought into full compliance with this article. n. The community adopts a cumulative substantial damage standard. Damages from multiple events over a rolling ten-year period will be aggregated to determine whether a structure meets the definition of substantial damage. (15) Coordinate with insurance adjusters prior to permitting any proposed work to bring any flood-damaged structure covered by a standard flood insurance policy into compliance (substantially damaged structures) to ensure eligibility for ICC funds. (16) Right of entry. a. After the certificate of occupancy has been issued for a building and the floodplain administrator observes or has reasonable cause to believe that renovations or retrofits have been made to the building, structure, or premises located in a SFHA that appear to be in violation of any provisions of this article, he/she shall have the right to seek entry into that building as described in subsections (b) to (e) below. b. Whenever it becomes necessary to make an inspection to enforce any of the provisions of this article, the floodplain administrator may enter such building, structure or premises at all reasonable times (normal business hours for the community) to inspect the same or perform any duty imposed upon the floodplain administrator by this article. c. If such building or premises are occupied, the floodplain administrator shall first present proper credentials and request entry. If such building, structure, or premises are unoccupied, he/she shall first make a reasonable effort to locate the owner or other persons having charge or control of such building or premises prior to entry. d. If entry is refused or owner cannot be located, the floodplain administrator shall have recourse to every remedy provided by law to secure the right of entry of the building, structure, or premises. e. When the floodplain administrator shall have first obtained a proper inspection warrant or other remedy provided by law to secure entry, no owner or occupant or any other persons having charge, care or control of any building, structure, or premises shall fail or neglect, after proper request is made as herein provided, to promptly permit entry therein by the floodplain administrator for the purpose of inspection and examination pursuant to this article.

(Ord. No. 4-2026, 3-5-2026)

Ask a question about Montgomery law

Corpus searches the Montgomery sections it holds and shows the ones that match, with their citations. Free, no sign-in.