§ 31.30.23 — Same—Treatment of fill material
The Code of the City of Oceanside, California (Supp. No. 50: codified through Ordinance No. 26-OR0412-1, enacted June 17, 2026) · Oceanside City Code § 31.30.23
Corpus is an independent public-information project, not the official City of Oceanside website. Stable reference: corpuslaw.us/code/a3dcd55f-5b5a-4478-921e-5f608918e47f
Sec. 31.30.23. - Same—Treatment of fill material.
The selected fill material shall be placed in layers which when compacted shall not exceed six (6) inches. Each layer shall be spread evenly and shall be thoroughly blade-mixed during the spreading to insure uniformity of material in each layer. (a) The moisture content of the fill material shall be such as to assure maximum compaction and stability, and may be controlled by either the addition of water or, if the moisture content is too high, by the aeration of the soil by additional blading. (b) After each layer has been placed, mixed and spread evenly, it shall be thoroughly compacted to not less than ninety (90) percent of maximum density. Compaction shall be by sheepsfoot rollers, multiple-wheel pneumatic-tired rollers or other types of acceptable rollers. Rolling shall be accomplished while the fill material is at the moisture content specified as a result of the data compiled for soil analysis. Rolling of each layer shall be continuous over its entire area, and the roller shall make sufficient trips to insure that the desired density has been obtained. (c) Fill slopes shall be compacted until the slopes are stable but not too dense for planting. There shall be no appreciable amount of loose soil on the slopes. (d) Field density tests shall be made of the compaction as determined by the city engineer, and copy of the results of each test transmitted to the city engineer. When sheepsfoot rollers are used, density reading shall be taken in the compacted material below the disturbed surface soil. When readings indicate that the density of any layer of fill or portion thereof is below the required ninety (90) percent density, the particular layer or portion shall be reworked until the required density has been obtained. (e) Fill operations shall continue as outlined above until the fill has been brought to the finished slopes and grades as shown on the accepted plans.
(Ord. No. 63-51, § 602)
Ask a question about Oceanside law
Corpus searches the Oceanside sections it holds and shows the ones that match, with their citations. Free, no sign-in.