For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 6-2022 — SIDEWALK ASSESSMENTS FOR CONSTRUCTING OR EXTENDING NEW SIDEWALKS

Code of the City of Raleigh (Supp. No. 69: codified through Ordinance No. (2025) 802, adopted October 21, 2025) · Raleigh City Code § 6-2022

Corpus is an independent public-information project, not the official City of Raleigh website. Stable reference: corpuslaw.us/code/a3e509b2-13f2-4e9d-b142-465acee0ff18

Sec. 6-2022. - SIDEWALK ASSESSMENTS FOR CONSTRUCTING OR EXTENDING NEW SIDEWALKS.

(a) The cost of new sidewalk construction or extensions shall be assessed at the rate as set forth in the City of Raleigh Fee Schedule. The cost shall be assessed against the property abutting on both sides of the street. If there already exists a sidewalk on the other side of the street, the total cost of which was assessed against the abutting property, the owner of the property requiring the new sidewalk shall pay the assessment, the remaining cost of the sidewalk to be borne by the City. If the City Council decides pursuant to §6-2014 that there is a public need for a sidewalk on both sides of the street, and no sidewalk assessment has been previously levied, the full cost of the second sidewalk shall be borne by the City. (b) Notwithstanding the charges established in §6-2022(a), the City shall make the following sidewalk improvements without assessment: (1) If sidewalk improvements are made simultaneously to both streets on which a lot abuts, assessment of the costs of the installations shall be based upon the entire frontage of one street (short side) plus the frontage of the other street in excess of one hundred fifty (150) feet. (2) If the lot is already served by a sidewalk which meets all City standards, any improvements to another abutting sidewalk shall be assessed against the lot owner to the extent that the frontage to be assessed exceeds one hundred fifty (150) feet in length. (3) If a lot fronts on an existing sidewalk which meets City standards and abuts at the rear on another street to be built or improved, no assessment shall be made if it shall appear that no reasonable subdivision of the lot can be made by which the new arrangement of lots will benefit from the new or improved sidewalk. (4) If a lot abuts on a sidewalk to be built or improved but physical or topographic restrictions prevent reasonable access thereto from the lot, then no assessment shall be made. In the event that such a lot later gains access formerly though impossible to the sidewalk which was improved, no driveway permit shall be issued until the lot owner has paid a fee equivalent to the amount the lot would have been previously assessed. (5) Sidewalk improvements within redevelopment areas as delineated pursuant to G.S. 160A-500 et seq., provided the cost of such work is exclusively paid from community development funds.

(Ord. No. 1979-236, 10-2-79; Ord. No. 1985-613, §2, 7-16-85; Ord. No. 1986-855, §2, 9-16-86; Ord. No. 1987-54A, §§1, 2, 9-15-87; Ord. No. 1992-999, §3, 6-16-92; Ord. No. 1995-660, §3, 6-20-95; Ord. No. 1995-760-TC-122, §10, TC-20C-95, 11-21-95; Ord. No. 1996-814, §1, 2-6-96; Ord. No. 2000-905, §4, 12-5-00; Ord. No. 2019-949, §5, 6-4-19, eff. 7-1-19)

Ask a question about Raleigh law

Corpus searches the Raleigh sections it holds and shows the ones that match, with their citations. Free, no sign-in.