15.01.350 - Required pool and spa inspections.
Inspection of pools and spas shall comply with the provisions of this section. A. Concrete construction. Upon receipt of a proper inspection request, the building official shall perform the following inspections of pools and spas constructed of concrete: 1. Steel and bonding. A steel and bonding inspection shall be performed after excavation is complete, the reinforcing steel is in place per the approved construction documents and all electrical bonding connections are made. 2. Pre-gunite inspection. All underground utilities, gas, water and electrical piping shall be completed at this time with required pressure tests. 3. Pre-plaster inspection. A pre-plaster inspection shall be performed when all equipment is installed, bonding and electrical work is complete and permanent barriers are in place. All required interior safety devices shall be in place and inspected at this time. 4. Final inspection. A final inspection shall be performed when the structure is complete and filled with water. All systems shall be operational and lights and ground fault circuit interrupter (GFCI) tested. The safety barriers and yard drainage shall be re-inspected. If applicable, a gas pressure test will be inspected and gas tag issued when the final inspection is approved. B. Manufactured pools and spas. Upon receipt of a proper inspection request, the building official shall perform the following inspections of manufactured pools and spas: 1. Underground utility and bonding inspection. An inspection shall be performed after all trenching and excavation work is complete. All underground utilities, gas, water and electrical piping shall be completed at this time with required pressure tests. Access barriers shall be installed and all electrical bonding connections shall be made. All required interior safety devices must be in place and inspected at this time. 2. Pre-deck inspection. A pre-deck inspection shall be performed prior to placing decks. The equipotential grid shall be in place and all electrical work complete. All equipment shall be connected and anchored in place. All permanent barriers shall be complete. 3. Final inspection. A final inspection shall be performed when the structure is complete and filled with water. All systems shall be operational and lights and GFCIs tested. The safety barriers and yard drainage shall be re-inspected. If applicable, a gas pressure test will be inspected and gas tag issued when the final inspection is approved.
(Ord. 2736, § 1 (part), 2008)
Ask a question about Henderson law
Corpus searches the Henderson sections it holds and shows the ones that match, with their citations. Free, no sign-in.