For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 7-194.4 — GCE requirements

Code of Ordinances of the City of Greenville, Mississippi (Supp. No. 31: codified through Ordinance No. 24-007, enacted August 26, 2024) · Greenville Code of Ordinances § 7-194.4

Corpus is an independent public-information project, not the official City of Greenville website. Stable reference: corpuslaw.us/code/a442b927-60f9-46b2-8c18-7b150c2d1195

Sec. 7-194.4. - GCE requirements.

(a) New FSEs, existing FSEs, upgrading of existing FSEs or change of ownership of existing FSEs requirements: (1) Any new FSE, existing FSE, upgrading of existing FSE, or change of ownership of existing FSE will be required to install and maintain a GCE(s). FSEs in one of these categories must submit a FOG plan to the city for approval. The FOG plan must include identification of all cooking and food preparation equipment (i.e. fryers, grills, woks, etc.); number and size of dishwashers, sinks, floor drains, and other plumbing fixtures; type of FSE classification; type of food served; and plans for the grease interceptor dimensions and location. (2) The city provides a Grease Control Inquiry Form (Attachment F) that can be submitted by the FSE or their representative. The city will review the FOG plan, GCE sizing, construction schedule and approve, or make changes, as necessary, to aid in preventing a FOG discharge from the FSE. (3) The city will perform inspections during the GCE construction/installation phase and annual inspection. (b) Newly constructed FSEs shall have separate sanitary (restroom) and kitchen process lines. The kitchen process lines shall be plumbed to appropriately sized GCE. No sanitary wastewater or stormwater shall be plumbed to the GCE. (c) The internal plumbing for all new FSEs shall be constructed to separate sanitary (restroom) flow from kitchen process flow. Sanitary flow and kitchen process discharges shall be approved separately by the city and shall discharge from the building separately. Kitchen process lines and sanitary lines may combine prior to entering the public sewer; however, the lines cannot be combined until after the GCE. (d) Grease interceptors or grease traps will be installed and connected so that it may be easily accessible for inspection, cleaning, and removal of grease at any time. (e) Existing FSEs are required to meet the program requirements. (f) New multi-unit (strip mall) facilities: (1) New strip malls or strip centers must have two (2) separate sewer line connections at each unit within the strip mall or strip center. One (1) sewer line will be for sanitary wastewater and one (1) sewer line will be for the kitchen area, or potential kitchen area, of each unit. The kitchen area, or potential kitchen area, sewer line will be connected to floor drains in the specified kitchen area, and will connect, or be able to connect, to other FSE kitchen fixtures, such as 3-compartment sinks, 2-compartment sinks, pre-rinse sinks, mop sinks, and hand wash sinks. (2) New multi-unit facility, or new "strip mall" facility, owners shall contact the city prior to conducting private plumbing work at the multi-unit facility site. Multi-unit facility owners, or their designated contractor, shall have plans for separate private wastewater lines for kitchen and sanitary wastewater for each "individual" unit. In addition, the plans shall identify "stub-out" locations to accommodate a minimum one thousand (1,000) gallon grease interceptor for each unit of the multi-unit facility. New multi-unit facility, or new "strip mall" facility owners shall consider suitable physical property space and sewer gradient that will be conducive to the installation of an exterior, in-ground grease interceptor when determining the building location. (3) FSEs located in a new multi-unit facility shall have a minimum of a one thousand (1,000) gallon grease interceptor installed, unless that FSE is identified as a Class 1 facility. (g) Approval of GCE: All new FSEs and upgraded FSEs must contact the city for final approval of the GCE. FSE shall submit construction documents (i.e. site map, design documents/calculations, as-built drawings and/or manufacturer's specification sheet) to the city prior to final approval. The city's review will include an onsite inspection of the installation of the GCE by the city, or their authorized representative. Failure of the FSE to contact the city to conduct the inspection will result in enforcement action.

(Ord. No. 18-001, § I, 1-25-18)

Ask a question about Greenville law

Corpus searches the Greenville sections it holds and shows the ones that match, with their citations. Free, no sign-in.