§ 18.04.502 — Sidewalks, Curbs, and Gutters
Reno Administrative Code, City of Reno, Nevada (Supp. No. 65, Update 1: codified through Ordinance No. 6740, adopted May 6, 2026) · Reno Annexation and Land Development Code § 18.04.502
Corpus is an independent public-information project, not the official City of Reno website. Stable reference: corpuslaw.us/code/a45da917-074d-4452-8d38-48b8c7162e05
18.04.502 - Sidewalks, Curbs, and Gutters
(a) Applicability (1) General Sidewalks, curbs, and gutters shall be required on all lots or parcels of land that are improved or upon which any building or construction shall take place, unless excepted in Subsection (2), below. Sidewalks are required on both sides of all streets, public and private, unless another means of pedestrian access is approved, or if the sidewalk is impractical or is unnecessary for pedestrian access purposes as determined by the Administrator. (2) Exceptions Sidewalks, curbs, and gutters are not required in the event of addition or remodel of 500 square feet or less to an existing structure. (3) Timing of Determination of Sidewalk Requirements In new developments, sidewalk requirements shall be determined at time of tentative map or parcel map approval. In the absence of any proposed division of land, determinations shall be made at time of entitlement and/or building permit. (4) Waiver of Sidewalk, Curb, and Gutter Requirements a. Upon application by a property owner and for cause shown, the Administrator may waive the requirement for curb, gutter, and/or sidewalk whenever the Administrator determines that it is not practical to be installed at the time of building or construction due to negative impacts on future road construction or improvements, undesirable obstruction to drainage patterns, flow paths, public safety or where a pedestrian circulation plan has been adopted for an area that indicates no sidewalks are planned for a site. b. The Administrator may waive the sidewalk requirement in the event of repair, remodeling, or addition to existing improvements on all parcels of land or for new construction of a single-family residence where sidewalks within 300 feet of the immediate area do not presently exist or where topographic constraints, walls, or landscaping or other obstructions prevent continuous extension on this property or others. c. The Administrator may waive or modify sidewalk requirements and allow alternative pedestrian circulation plans for hillside developments, to reduce project grading, or to satisfy Low Impact Development objectives. d. No requests for sidewalk waivers will be considered on any parcels of land, which are located within ¼ mile of any school measured in a straight line from property line to property line. e. The decision denying the applicant of the sidewalk waiver may be appealed in writing to the Hearing Examiner within ten days after notification of such denial. (5) Hold-Harmless Agreement To have consideration for any provisions described in this subsection, the applicant shall provide to the City a hold-harmless agreement, subject to the approval of the City Attorney. The applicant shall also waive any protest or objection pursuant to state statutes to any future assessment district that may be formed to incorporate sidewalk upon all the tracts in the district. Such waiver of protest shall be recorded in the Office of the County Recorder and the provisions thereof complied with by any successor in interest. (b) Sidewalk Dimensions (1) Sidewalks shall be a minimum of five feet wide along local and residential collector streets. (2) Sidewalks shall be a minimum of six feet wide along commercial collector and arterial streets. (3) Additional district specific requirements for sidewalks and landscaped parkways are set forth in Articles 8, 9, and 10, below. (4) The Administrator may modify minimum sidewalk dimensions to protect existing structures, utilities, street trees, or landscaping; or for consistency with existing sidewalk dimensions on adjacent properties. Any modifications shall maintain sufficient access for people with disabilities. (c) Commencement and Completion of Construction Construction of sidewalks, curbs, and gutters shall be commenced within 30 days from the date of issuance of the permit for the work contemplated or the date of completion of the engineering required to establish the street grade, whichever is later, and shall be completed within 60 days from such date.
(Ord. No. 6692, § 1(Exh. A), 1-8-25)
Ask a question about Reno law
Corpus searches the Reno sections it holds and shows the ones that match, with their citations. Free, no sign-in.
