For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

2:106 — System facilities and equipment

Code of the City of Ann Arbor, Michigan (Supp. No. 26: codified through Ordinance No. 26-22, enacted July 20, 2026) · Ann Arbor City Code § 2:106

Corpus is an independent public-information project, not the official City of Ann Arbor website. Stable reference: corpuslaw.us/code/a478419b-ead9-4dad-becf-6e2a6fad9ba6

2:106. - System facilities and equipment.

(1) A grantee's cable system shall have capabilities at least equal to those of the following model system, except that for those parts of the cable system serving the University of Michigan, the grantee and the university may agree on different capabilities: (a) The subscriber network shall have an upper transmission frequency of at least 750 MHz on all active components and at least 1 GHz for all passive components. All equipment will be installed and amplifiers spaced so as to permit running the system at 750 MHz. These specifications in MHz or GHz refer to the engineering bandwidth of the system and do not limit what sorts of signals (e.g., analog or digital) grantee may carry on any part of that bandwidth. (b) The system shall utilize a hybrid fiber coaxial design. No more than 600 residences, businesses and other structures on the average, or 900 at any node in the system, shall be passed by any single fiber node. (c) There shall be no more than 5 amplifiers in a cascade following any node on the average, or 7 at any point on the system, except that up to 2 additional active components may be added if these additional components enhance signal quality. (d) The system shall provide operable 2-way capability throughout the system. (e) Regarding secondary audio programming (SAP), a grantee shall comply with whichever of the following requirements (i) or (ii) is more stringent: (i) comply with all applicable FCC regulations; or (ii) pass through all SAP delivered to the grantee on broadcast channels, on PEG channels, and on the top 10 satellite-delivered channels, as defined by an average of the national audience share during prime time, plus 5 additional channels per year until the grantee is passing through the SAP for all programmers delivering such signals, (2) At least 60 days prior to the date construction of any initial system construction or system upgrade is scheduled to commence, the grantee shall provide a detailed system design and construction plan, available for review by the city, in hardcopy and in a GIS format established by the Michigan Public Service Commission or acceptable to the city. (a) The plan shall include at least the following elements to the extent they are applicable to the system upgrade: (i) Design type, trunk and feeder design, where applicable, and number and location of hubs or nodes. (ii) Distribution system equipment to be used. (iii) Plans for standby power. (iv) Longest amplifier cascade in system (number of amplifiers, number of miles, type of cable/fiber). (v) Design maps (and trunk tree maps where applicable) for the system. (vi) Proposed project management plan and project timetable. (b) The system design will be shown on maps of industry standard scale using standard symbology, and shall depict all electronic and physical features of the cable plant. The city may review the plan and, within 60 days of the date the plan is made available for city review, submit comments regarding the system upgrade to the grantee. Within 30 days of receipt of the comments, the grantee shall submit a revised plan to the city, either incorporating the comments or explaining why the comments were not included. If the city believes the design plan fails to satisfy or is likely to fail to satisfy the grantee's obligations, it may take any appropriate action it is entitled to take under the franchise agreement, this chapter, or other applicable law. The city's review does not excuse any non-performance under the franchise agreement, this chapter or other applicable law. (3) Periodic progress reporting. (a) Following the commencement of construction of a system upgrade or any similar major construction, monthly until the construction is completed, the grantee shall provide an update on the progress of the upgrade according to the grantee's general plan, unless the city waives such report. (b) Consequences of delays. The grantee must timely complete any required system upgrade, including any institutional network, by the times specified in its franchise agreement, or be able to reasonably justify any delays. For failure to timely complete construction, the grantee shall be in violation of a material provision of its franchise agreement and the city may, in its sole discretion, either grant the grantee an extension of time to complete such construction or implement any enforcement measures specified in the franchise agreement or this chapter, including but not limited to revocation of the franchise. (4) In any franchise agreement the city shall seek to obtain commitments for the grantee to provide at a minimum the following broad categories of video programming: (1) at least 1 Spanish-language channel; and (2) at least the equivalent of 1 other full-time channel in another foreign language or languages appropriate to the population of the Ann Arbor area.

(Ord. No. 31-02, § 2, 8-5-02)

Ask a question about Ann Arbor law

Corpus searches the Ann Arbor sections it holds and shows the ones that match, with their citations. Free, no sign-in.