For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14-1002 — Definitions

Code of Ordinances, City of Corpus Christi, Texas (Supp. No. 44: codified through Ordinance No. 033940, enacted June 2, 2026) · Corpus Christi Code of Ordinances § 14-1002

Corpus is an independent public-information project, not the official City of Corpus Christi website. Stable reference: corpuslaw.us/code/a4c6c26d-353c-4885-aa30-65a1c7e184c1

Sec. 14-1002. - Definitions.

For the purposes of this article, the following terms have the meanings ascribed to them in this section, unless the context clearly indicates otherwise: Area adjacent to Nueces River water supply means the land that is within one thousand five hundred (1,500) feet from the edge of the Nueces River or any of its tributaries above the Calallen Saltwater Intrusion Dam. BMP means best management practice. Disturbing means clearing, grading, excavation, or other construction-related activities including the open storage of raw materials, transport and parking of vehicles, etc., on an unpaved area. Environmentally sensitive area means: Receiving waters. Stream segment, bay or estuary classified as having an exceptional aquatic life use by TCEQ under 30 TAC 307.7(b)(3) and 307.10. Areas identified as providing critical habitat for an endangered, threatened, or protected species. The U.S. Fish and Wildlife Service or Texas Department of Parks and Recreation should be consulted, if necessary. Wetlands as defined by 33 CFR 328.3(b). State owned submerged land. Critical dune areas, as determined by the land commissioner under Texas Natural Resources Code § 63.121. Area adjacent to the Nueces River Water Supply. Floodplains, as determined by the Federal Emergency Management Agency. Floodways, as determined by the Federal Emergency Management Agency. Velocity zones, as determined by the Federal Emergency Management Agency. EPA means the United States Environmental Protection Agency. FEMA means Federal Emergency Management Agency. Harmful liquid means a liquid that may cause harm to the environment, such as oil, chemicals, and hazardous substances. Lot means a lot as defined by § 3.1.41 of the zoning ordinance. NPDES means a National Pollution Discharge Elimination System. Permanent stabilization means that all unpaved areas of the site, not covered by permanent structures, which were disturbed by construction activities, have a uniform perennial vegetative cover with a density of seventy (70) per cent or equivalent permanent stabilization has been used, such as coverage with geotextiles and mulch. Pollution control plan means a site plan that contains the following information: a. The outline of the site. b. A delineation of the area of the site that will be disturbed by construction activities. c. The direction of flow of storm water drainage entering and leaving the site. If the drainage pattern will be altered, both the existing drainage patterns and proposed drainage patterns must be shown. d. A description and location of any existing drainage structures on the site and any drainage structures that will be constructed on the site. e. A description of how any run-on storm water will be handled, including sheet flow entering the site from adjoining property. f. A description and the location of any environmentally sensitive area that is located on the site or adjoins the site, which will receive storm water directly from the site. g. The boundary line between the site and any adjoining state owned submerged land. A preliminary boundary line may be used in a pollution control plan submitted with a preliminary plat. The pollution control plan must be amended prior to filing of a final plat, once a final boundary determination has been approved by the general land office, to reflect any difference between the preliminary boundary line and the approved boundary line. h. The location of any FEMA Flood Insurance Rate Map 100-Year Floodplain Boundaries, Floodway Boundaries or FEMA Velocity Zone Boundaries that encroach on the site. Preliminary boundaries may be used in the pollution control plan submitted with a preliminary plat. The pollution control plan must be amended to reflect any difference between the preliminary boundaries and the boundaries shown on the final plat. i. A description and the location of all temporary control measures that will be implemented and installed during construction to control erosion, sedimentation, and the discharge of pollution into the city's municipal separate storm sewer system. j. The permanent control measures that will be constructed to control erosion, sedimentation, and the discharge of pollutants into the city's municipal separate storm sewer system after completion of construction. Receiving waters means Corpus Christi Bay, Nueces Bay, Oso Bay, Inner Harbor, Laguna Madre, Nueces River, Oso Creek, West Oso Creek, Petronilla Creek, and the Gulf of Mexico. The term includes perennial and intermittent streams that are natural tributaries to those waters, but does not include manmade drainage structures. Responsible party means the owner, occupant, developer, builder, or general contractor who has operational control over the site specification (including the ability to make modifications in specifications), or who has operational control over day to day activities at the site and is able to ensure compliance with plan requirements and permit conditions (e.g., a person who is authorized to direct the conduct of workers at the site). Any person who has filed a notice of intent (NOI) with EPA or TCEQ or posted a Small Construction Site Notice is presumed to be a responsible party under this article until the person has filed a notice of termination (NOT) with EPA or TCEQ or removed a Small Construction Site Notice and sent the director of developmental services a copy of the NOT or Small Construction Site Notice with removal date. Significant redevelopment means a change in the use of a tract of land that increases the proportion of impervious surface, a change in the use of a tract of land that will result in an increase of pollutants that may be carried off the property by storm waters, or the alteration or repair of a facility, which requires the facility to be brought into compliance with the current Technical Construction Codes requirements under Section 14-211(c) of the city's Technical Construction Codes. Single-lot, single-family residential construction means the construction of a single-family residential structure and accessory buildings upon a single lot, regardless of size. The construction of each individual residential structure is considered a single-lot, single-family residential construction, even if the responsible party is simultaneously constructing another residential structure on an adjoining lot. For the purposes of this article, a lot may include one (1) or more adjoining platted lots that are treated as a single tract of land. Storm water means storm water runoff, snow melt runoff, and surface runoff and drainage. Storm water quality management plan means a preliminary engineering report and analysis that provides: a. A brief description of the project, with maps showing the area covered by the plan. b. The land use assumptions used. Generally, the most impactive land use allowed under the current zoning, any changes in the zoning being proposed, or the applicable area development plan should be assumed. However, a less impactive land use may be used if an application is submitted to rezone the tract to a less impactive land use or the highest use allowed under the current zoning is less than the use designated in the area development plan. c. Hydraulic calculations based upon established procedures (such as the rational method). d. An on-site drainage plan, which details the direction of flow and collection structures, including the size and required capacity of the drainage structures. e. The on-site drainage plan should address how run-on storm water will be handled, including sheet flow entering the site from adjoining property. f. Demonstrations of the conformance with existing master plan drainage and/or the need to master plan amendment for both on-site and off-site improvements. In the absence of a request for rezoning, the most impactive land use allowed under the current or proposed zoning will be assumed. g. Delineation of the route of runoff to ultimate outfall. This information will be used to determine the ultimate capacity for water quality treatment at an ultimate outfall station. h. Identification of any environmentally sensitive area that is on the site, or that would be sensitive to storm water pollution from the site. Areas of investigation should include, but are not limited to, water supply sources, recreational waters, wetlands, barrier island dunes, and other sensitive ecological systems. TCEQ means the Texas Commission on Environmental Quality. TPDES means a Texas Pollution Discharge Elimination System.

(Ord. No. 25467, § 1, 9-9-2003; Ord. No. 029265, § 1, 10-25-2011)

Ask a question about Corpus Christi law

Corpus searches the Corpus Christi sections it holds and shows the ones that match, with their citations. Free, no sign-in.