For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8-3B-3 — RESPONSIBILITIES FOR IMPROVEMENT COSTS

City Code of West Jordan, Utah (2026 S-39: code current through Ord. 26-41, passed 7-28-2026) · West Jordan City Code § 8-3B-3

Corpus is an independent public-information project, not the official City of West Jordan website. Stable reference: corpuslaw.us/code/a52caf66-d48e-4a94-9f1f-94edf91cd96e

8-3B-3: RESPONSIBILITIES FOR IMPROVEMENT COSTS:

A. As a condition of development approval, a developer shall be required to install public improvements which are reasonably necessary to serve the proposed development at adopted level of service standards. Where required by the city CITY: The municipal corporation and political subdivision of the state of Utah known as the City of West Jordan. engineer to connect to existing public improvements with adequate capacity, accommodate future development, or accommodate the CFP CFP: The West Jordan capital facilities plan. , the developer shall also be required to either: 1) install off site or oversized public improvements reasonably necessary to extend, expand or improve the city infrastructure beyond that which is necessary to serve or benefit the particular development; or 2) enter into a deferred improvement agreement DEFERRED IMPROVEMENT AGREEMENT: An agreement for deferred improvements. pursuant to the provisions of this article. Improvements specifically listed but not yet built in the city capital facilities CAPITAL FACILITIES: Any or all of the following facilities that have a life expectancy of ten (10) or more years: A. Water rights and water supply; B. Water treatment and distribution facilities; C. Wastewater collection and treatment facilities; D. Stormwater, drainage and flood control facilities; E. Roadway facilities; F. Parks, recreation facilities, open space and trails; and G. Public safety facilities. plan (CFP) may be constructed by the developer out of the CFP planned sequence if such construction is acceptable to the city and does not create unreasonable collateral hardships to the infrastructure system. B. All design costs, construction costs, installation costs, and the costs of acquiring and dedicating real property LAND, REAL ESTATE, REAL PROPERTY: Means and includes land, tenements, hereditaments, water rights, possessory rights and claims. and easements shall be paid by the developer, at the developer's sole expense. (2001 Code § 87-5-203; amd. Ord. 13-02, 2-13-2013)

Ask a question about West Jordan law

Corpus searches the West Jordan sections it holds and shows the ones that match, with their citations. Free, no sign-in.