Sec. 5-4. - Protection of lots after demolition of structures thereon.
Whenever application is made for a permit to demolish a structure, the building inspector shall require that application also be made and that plans be submitted and carried out within sixty (60) days of said application or whenever seasonable conditions may allow, for the protection of said lot by grading and seeding; application of concrete, gravel, asphalt, or other suitable refinishing material; or the rebuilding on said lot. If no immediate reuse of the property is proposed and a building permit is not issued for the reuse of the property in a timely fashion and the property is located in an area subject to littering and dumping, the building inspector shall require the fencing of said lot within ten (10) days upon completion of demolition.
(Ord. 1980, ch. 80-33, § 1, 6-10-80; Ord. 1992, ch. 92-2, § 1, 1-10-92)