§ 2-25 — Basic stormwater management design criteria
Code of Ordinances, City of Southaven, Mississippi (Supp. No. 70: codified through Resolution of June 2, 2026) · Southaven Code of Ordinances § 2-25
Corpus is an independent public-information project, not the official City of Southaven website. Stable reference: corpuslaw.us/code/a753097b-4c14-4a86-b924-83f23b2448a9
Sec. 2-25. - Basic stormwater management design criteria.
(a) Minimum control requirements. All stormwater management practices will be designed so that the specific storm frequency storage volumes (e.g., recharge, water quality, channel protection, twenty-five-year, one-hundred-year) as identified in the current stormwater design manual are met, unless the AEA grants the applicant a waiver or the applicant is exempt from such requirements. In addition, if hydrologic or topographic conditions warrant greater control than that provided by the minimum control requirements, the AEA reserves the right to impose any and all additional requirements deemed necessary to control the volume, timing, and rate of runoff. (b) Site design feasibility. Stormwater management practices for a site shall be chosen based on the physical conditions of the site. Among the factors that should be considered: Topography; Maximum drainage area; Depth to water table; Soils; Slopes; Terrain; Head; Location in relation to environmentally sensitive features or ultra-urban areas. Applicants shall consult the stormwater design manual for guidance on the factors that determine site design feasibility when selecting a stormwater management practice. (c) Conveyance issues. All stormwater management practices shall be designed to convey stormwater to allow for the maximum removal of pollutants and reduction in flow velocities. This shall include, but not be limited to: Maximizing of flow paths from inflow points to outflow points; Protection of inlet and outfall structures; Elimination of erosive flow velocities; Providing of underdrain systems, where applicable; The stormwater design manual shall provide detailed guidance on the requirements for conveyance for each of the approved stormwater management practices. (d) Treatment/geometry conditions. All stormwater management practices shall be designed to capture and treat stormwater runoff according to the specifications outlined in the stormwater design manual. These specifications will designate the water quantity and quality treatment criteria that apply to an approved stormwater management practice. (e) Landscaping plans required. All stormwater management practices must have a landscaping plan detailing both the vegetation to be in the practice and how and who will manage and maintain this vegetation. A registered landscape architect or soil conservation district or soil conservation expert must prepare this plan. (f) Non-structural stormwater practices. The use of non-structural stormwater treatment practices is encouraged in order to minimize the reliance on structural practices. Credit in the form of reductions in the amount of stormwater that must be managed can be earned through the use of non-structural practices that reduce the generation of stormwater from the site. These non-structural practices are explained in detail in the stormwater design manual and applicants wishing to obtain credit for use of non-structural practices must ensure that these practices are documented and remain unaltered by subsequent property owners.
(Ord. of 12-6-05)
Ask a question about Southaven law
Corpus searches the Southaven sections it holds and shows the ones that match, with their citations. Free, no sign-in.
