Sec. 7-158. - Fees.
(a) Generally. Electrical permit and inspection fees are established as follows:
For issuing each permit a fee of ten dollars ($10.00) plus the following:
(1) New construction—Residential, commercial, industrial: One dollar ($1.00) per designed/permitted amp requirement.
(2) Additions/renovations: One dollar ($1.00) per added designed/permitted amp requirement.
(3) Temporary service: Fifty dollars ($50.00) for first two hundred (200) amps, plus one dollar ($1.00) for each additional amp above two hundred (200) amps.
(4) Demolition: No charge for electrical.
(5) Repeat visits for final inspection: Fifty dollars ($50.00) for first repeat visit, one hundred dollars ($100.00) for each subsequent visit.
(6) Damage/maintenance fee: One hundred dollars ($100.00).
(b) Failure to obtain permit. If any person commences any electrical work on a building or structure or anything applicable before obtaining the necessary permit from the city, he shall be charged a double fee.
(c) For buildings that are (1) one hundred million dollars ($100,000,000.00) or more in valuation and (2) are eligible for fee-in-lieu, the permit fee shall not exceed twenty-five thousand dollars ($25,000.00) per building.
(Code 1962, § 8-53; Ord. No. 3263, § 1, 1-19-66; Ord. No. 3379, § 1, 5-4-71; Ord. No. 3608, § 1, 8-4-81; Ord. No. 3949, § 15, 2-16-93; Ord. No. 4229, § II, 7-8-03; Ord. No. 4496, § II, 2-6-18, eff. 4-6-18; Ord. No. 4568, 12-20-22; Ord. No. 4601, 8-5-25)