§ 37-64 — Same—Methods of construction

Code of Ordinances of the City of Pasadena, Texas (Supp. No. 33, Update 2: codified through Ordinance No. 2026-143, enacted September 1, 2026) · Pasadena City Code § 37-64

Corpus is an independent public-information project, not the official City of Pasadena website. Stable reference: corpuslaw.us/code/a82fc62b-dbe6-4cef-a307-02baee8bf973

Sec. 37-64. - Same—Methods of construction.

Water and sanitary sewer main extensions to serve a real estate subdivision in the city may be accomplished in the manner prescribed in this section. (a) By private contract or developer himself. (1) Upon approval by the city, a developer of an addition or plat shall design and prepare construction plans of water and sanitary sewer facilities, or either of them, to serve the subdivision, including any access or off-site facilities that may be required. These plans shall conform in all details to the city's standard as to design, grade, location, size and quality of materials and construction. Plans and profiles submitted by the developer's engineer shall be inked on standard twenty-four (24) inch by thirty-six (36) inch sheets of tracing linen. Plans and profiles shall be shown at scales of one (1) inch to forty (40) feet or one (1) inch to one hundred (100) feet horizontal and one (1) inch to six (6) feet vertical, unless approval is given otherwise. Plans and profiles shall show clearly all surface improvements, all existing or proposed subsurface utility lines and obstructions, and street and alley grades as approved by the department of public works. The engineer submitting the plans and profiles must be a registered professional civil engineer in the State of Texas, and he must affix his seal and signature to the tracings of all plans and profiles. (2) Upon preliminary approval of the plans by the city, the developer may enter into a contract with any individual or may himself construct the system as so planned; provided, however, that the construction and installation of the water mains and sanitary sewer mains, or either of them, shall be supervised by inspectors of the city to see that the installation is made in accordance with the plans and the city's standard specifications which, in every instance, shall be a part of the installation contract. (3) The completed tracings for water and sanitary sewer plans and profiles shall then be submitted to the public works department for final approval, accompanied by two (2) copies of the plans and profiles of the storm sewers and street grades as approved by the department of public works and one (1) copy of the plat of the addition that has been recorded in the records of the county and has been so stamped. Upon final approval, the tracings will be returned to the developer's engineer for the purpose of making such prints as the city may require, after which the tracings shall be returned to become permanent property of the public works department. (4) When the project is ready for construction and the plat approved by the planning and zoning commission and filed for record, line and grade stakes will be set by the developer. (5) No installation of water mains will be made at any other location except a dedicated street, alley or an easement running in favor of the city which shall be filed of record by the owner of the addition. (6) Any such installation, when made, shall become the property of the city, free and clear of all encumbrances, and any contract entered into between the developer and a contractor shall provide for a performance bond and payment bond such as the city uses in its standard specifications, which, in every instance, shall be a part of the installation contract. The city shall be named as one (1) of the beneficiaries in such bond. (7) In the event the developer makes the installation himself, then he shall execute a performance bond and payment bond in favor of the city in the same form and conditioned in the same manner as provided for in the standard contract documents used by the city in making of water and sanitary sewer installations. (8) The city specifically reserves the option to advertise for bids and install all or any portion of extensions of water and sanitary sewer lines over eight (8) inches in size where evaluated prices are not specified in section 37-65. (b) By city contract. Upon approval by the city, a developer of an addition or plat shall design and prepare construction plans of water and sanitary sewer facilities that may be required. The city will not be obligated to proceed under a city contract for partial construction of a project. The developer of an addition or plat may deposit with the city the total cost of all such extensions required to serve, including the cost of approach or off-site mains fronting property not owned by the developer, if required by the provisions of section 37-62(d). The city will construct such mains and upon determination of final completion cost, will refund any excess amount deposited or require of such developer additional funds due to defray the entire cost of the entire project. Refundable amounts for off-site costs or over-size cost shall be in accordance with section 37-62 and will be determined and refunded on the basis of unit bid prices of the project; provided, however, the city reserves the right to reject any unbalanced or unfavorable bid and may refuse to proceed under this basis if weather or seasonal conditions are likely to cause excessive costs to be bid for the work. If the developer desires to proceed under a contract deemed to be unbalanced or unfavorable, refundable amounts for off-site or over-size cost will be determined and refunded on the basis of evaluated cost.

(Ord. No. 68-202, § 4-4, 11-19-68)