For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 25-8-322 — CLEARING FOR A ROADWAY

Austin City Code (Supp. No. 174: codified through Ordinance No. 20260521-050, effective June 1, 2026) · Austin City Code § 25-8-322

Corpus is an independent public-information project, not the official City of Austin website. Stable reference: corpuslaw.us/code/a90a14f4-724b-4aa4-90fa-079848c3e536

§ 25-8-322 - CLEARING FOR A ROADWAY.

(A) A person may clear an area for road construction after site plan or final plat approval under this section. (B) Roadway clearing width may not exceed: (1) twice the roadway surface width, or the width of the dedicated right-of-way, whichever is less; or (2) for road construction problem areas of less than 300 feet in length, two and one-half times the roadway width. (C) The director may grant an administrative variance to Subsection (B) if required by unusual topographic conditions. (D) If clearing on slopes could result in materials sliding onto areas beyond the clearing widths described in Subsection (B), retaining walls or other preventative methods are required. (E) The length of time between rough cutting and final surfacing of roadways may not exceed 18 months. (F) If the applicant does not meet the deadline described in Subsection (E), the city manager shall notify the applicant in writing that the City will finish the roadways or revegetate the disturbed area at the applicant's expense unless the work is completed not later than the 60th day after the date of the notice.

Source: Section 13-7-15; Ord. 990225-70; Ord. 010329-18; Ord. 031211-11; Ord. 20060504-039.

Ask a question about Austin law

Corpus searches the Austin sections it holds and shows the ones that match, with their citations. Free, no sign-in.