For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 2.35 — Integrated Water Connection Fee Schedule

Code of the City of Grand Rapids, Michigan (Supp. No. 70: codified through Ordinance No. 2026-08, enacted April 14, 2026) · Grand Rapids City Code § 2.35

Corpus is an independent public-information project, not the official City of Grand Rapids website. Stable reference: corpuslaw.us/code/aa41c00c-75d0-4f31-8fa1-80db73f32af0

Sec. 2.35. - Integrated Water Connection Fee Schedule.

(1) When a property owner or user is requested or required to connect to the System and has not previously paid or been assessed a connection fee, a connection fee in accordance with a connection fee schedule established as provided in Section 2.33 shall apply. (2) Except as otherwise provided in the immediately succeeding paragraph, the foregoing integrated water connection base fee schedule for single-family and multi-family residential dwelling units shall be adjusted upward and downward as follows: A single-family residential dwelling unit located on a parcel containing twenty thousand (20,000) square feet shall pay the applicable integrated connection fee in accordance with the foregoing schedule. When determining the square footage of a residential parcel for the purposes of determining the appropriate integrated connection fee, parcel size may be adjusted downward to take into consideration such things as wetlands, lakes, streams and other unusual characteristics of the parcel in accordance with policies approved from time to time by the Utility Advisory Board. To the extent the size of a parcel, as adjusted, is greater than or less than twenty thousand (20,000) square feet, one-half (½) the applicable integrated connection fee will increase or decrease by the same percentage increase or decrease in the parcel above or below twenty thousand (20,000) square feet. In the case of multi-family residential dwellings, in order to determine the size of the parcel assigned to each dwelling unit for purposes of calculating the integrated connection fee to be paid by each multi-family residential dwelling unit, the total square footage of the parcel, as adjusted, on which the multi-family residential dwelling is located shall be divided by the total number of residential units. Notwithstanding any other provision in this subsection, the integrated connection fee for a single-family residential dwelling unit or multi-family residential dwelling unit shall not exceed four and one-half (4½) times the applicable base integrated connection fee set forth in the foregoing schedule. There shall be no upward adjustment in the integrated water service connection fee payable for a single-family residential dwelling unit connecting to the Water System if (a) each of the following conditions are met (1) a building permit shall have been obtained, (2) the dwelling unit shall have been constructed, and (3) a certificate of occupancy shall have been issued prior to January 1, 2000 or (b) local building permit fees have been paid to the local governmental unit prior to January 1, 2000 for a single-family residential dwelling unit to be constructed on or after January 1, 2000. When connecting to the Water System, Users living in or owning such single-family residential dwelling units shall pay the applicable base integrated connection fee set forth in the Integrated Water Connection Base Fee Schedule adjusted downward, if applicable, in accordance with the immediate preceding paragraph. Effective January 1, 2005 and January 1st of every year thereafter, the Integrated Water Connection Base Fees shall be adjusted by a percentage, which is determined by the annual change in the Consumer Price Index (the "Index") calculated as follows: (a) The Consumer Price Index shall be that Index referred to as the Consumer Price Index, US City Average, All Urban Consumers, published by the U.S. Department of Labor-Bureau of Statistics ((1982-84)=100). In the event the method of determining the Index is substantially altered, the basis for determining the annual change thereafter shall be the Index which is most comparable to the Index described above. (b) For the purpose of computing the percentage change each calendar year, the Index for the month of August for the prior calendar year shall be subtracted from the Index for the immediately preceding August. The result so obtained (if positive) shall be divided by the Index for the month of August for the prior calendar year to obtain the percentage increase which shall be applied to the then current Integrated Water Connection Base Fee Schedule to determine the new calendar year schedule. The foregoing Integrated Connection Fee is due and payable at the time a User receives a permit to connect to the Water System. A permit issued by the City to connect to the Water System shall expire one hundred eighty (180) days from the date the permit was issued. The user receiving services who applies for a larger water meter than the one presently in service shall pay an Integrated Connection Fee which is the difference in cost between the meter size in service and the one applied for in accordance with the Integrated Connection Fee in effect at the time of application. No credit or rebate shall be made in the case of application for a smaller meter size. Existing commercial and industrial customers may request the installation of an additional meter to measure water used solely for irrigation purposes. There shall be no Integrated Connection Fee for the additional meter provided combined maximum capacity as defined by the American Water Works Association Standards C700-90 and C702-92, as amended, does not exceed the maximum capacity of the original meter. If the original maximum capacity is exceeded, the customer shall pay as an Integrated Connection Fee the difference between the fee for the original meter and what the fee would be if the maximum capacities of all meters were totaled. The additional Integrated Connection Fee shall be based upon the fees in effect at the time of installation of the additional meter.

(Ord. No. 77-57, 11-1-77; Ord. No. 82-87, 12-21-82; Ord. No. 88-43, § 1, 6-28-88; Ord. No. 91-47, § 1, 9-24-91; Ord. No. 95-72, § 2, 12-12-95; Ord. No. 96-48, § 2, 12-17-96; Ord. No. 97-62, § 2, 12-16-97; Ord. No. 98-59, § 2, 12-15-98; Ord. No. 99-28, § 1, 6-8-99; Ord. No. 2000-31, § 1, 6-27-00; Ord. No. 2002-57, § 1, 10-1-02; Ord. No. 2004-81, § 2, 12-21-04; Ord. No. 2005-98, § 2, 12-20-05; Ord. No. 2006-81, § 2, 12-19-06; Ord. No. 2007-69, § 2, 12-18-07; Ord. No. 2008-54, § 2, 12-23-08; Ord. No. 2010-72, § 2, 12-21-10; Ord. No. 2011-58, § 2, 12-20-11; Ord. No. 2012-63, § 2, 12-18-12; Ord. No. 2013-86, § 2, 12-17-13; Ord. No. 2014-87, § 2, 12-16-14; Ord. No. 2015-63, § 3, 10-27-15)

Ask a question about Grand Rapids law

Corpus searches the Grand Rapids sections it holds and shows the ones that match, with their citations. Free, no sign-in.