Sec. 10-131. - Application process for erosion response permit.
(a) Prior to submission of any erosion response permit application, the applicant is encouraged to confer with the planning director's staff on an informal basis to discuss the proposed application and its conformity with the comprehensive plan; the applicable dune protection and beach access plans; the erosion response plan; dune protection, beach access, and erosion response regulations; state law and regulations; and the proposed development's relationship to surrounding property, streets, existing drainage patterns, existing and proposed utilities, etc. (b) In order to obtain an erosion response permit, the applicant shall make an erosion response permit application, as outlined in section 10-132, if the proposed construction is seaward of the erosion setback line (including an elevated dune walkover; paved walkways, parking areas, and patios; storage sheds; swimming pools, gazebos, and other accessory structures). (c) Potential applicants proposing construction seaward of the erosion setback line may submit descriptions of proposed construction to the planning director as outlined in Appendix XIX. (d) If the potential applicant seeks to establish that no erosion response permit is required the description shall explain why. The planning director shall determine whether the construction requires an erosion response permit under these regulations. Upon determination that a project does or does not require an erosion response permit under these regulations, the planning director shall notify the potential applicant in writing of such action. (e) Within three (3) working days of receipt of an erosion response permit application, the planning director shall review the application for completeness. (1) If an application is incomplete the planning director will notify the applicant of the deficiencies and offer the applicant the opportunity to provide all required information and drawings. (2) An application for an erosion response permit shall be deemed to have been abandoned two (2) months from the date of filing for the permit, unless all required information and drawings are provided before then. (f) An application must be considered complete when information requested by planning director has been provided. (g) Within five (5) days of determining that the application is complete the planning director shall review the completed application. (h) Within three (3) working days of the date the planning director takes final action on an application, the planning director shall notify the applicant whether the erosion response permit was approved or denied and what conditions, if any, are required.
(Ord. No. 029541, § 10, 6-26-2012)