4115.05 - Types of inspections.
The building official upon notification from the permit holder or the building official's agent shall make the following inspections of buildings and shall either approve the portion of the construction as completed or shall notify the permit holder or the permit holder's agent wherein the same fails to comply with the law. (A) Foundation and Footing Inspection. To be made after trenches are excavated and forms erected and when all materials for the foundation and footing are delivered on the job. Where concrete from a central mixing plant (commonly termed "transit mixed") is to be used, materials need not be on the job. (B) Frame Inspection. To be made after the roof, all framing, fireblocking and bracing is in place and all pipes, chimneys and vents are complete. (C) Insulation Inspection. To be made after all insulation is in place and before covering, except blown-in attic insulation. Blown-in attic insulation to be inspected after installation of ceiling material or at final inspection. (D) Final Inspection. To be made after the building is completed and ready for occupancy, or in the case of parking lots to be made after the parking lot is completed and ready for use.
(Ord. 2121-94; Ord. No. 2019-2021, § 1, 7-26-2021)
Ask a question about Columbus law
Corpus searches the Columbus sections it holds and shows the ones that match, with their citations. Free, no sign-in.