§ 27-6 — Purpose
Code of the City of Charleston, South Carolina (Supp. No. 115: codified through Ordinance No. 2026-092, enacted May 26, 2026) · Charleston, S.C., City Code § 27-6
Corpus is an independent public-information project, not the official City of Charleston website. Stable reference: corpuslaw.us/code/abb59fa1-338d-4e6b-8314-368324e63d0a
Sec. 27-6. - Purpose.
(a) It is the purpose of this article to protect, maintain, and enhance water quality and the environment of the city and the short-term and long-term public health, safety, and general welfare of the citizens of the city. This article is also designed to minimize property damage by establishing requirements and procedures to control the potential adverse effects of increased stormwater runoff and related pollutant loads associated with both future development and existing developed land. Proper management of stormwater runoff will further the purpose of this article to ensure a functional drainage system, reduce the effects of development on land and riparian erosion, attain and maintain water quality standards, enhance the local environment associated with the drainage system, reduce local flooding, maintain to the maximum extent practicable pre-developed runoff characteristics of the area in terms of flow rate, volume, and pollutant concentration, and facilitate economic development while mitigating associated pollutant, flooding, erosion, and drainage impacts. (b) It is further the purpose of this article to direct the development and implementation of a stormwater management program (SWMP) and to establish legal authority which authorizes or enables the city at a minimum to: (1) Comply with state and federal requirements related to stormwater management developed pursuant to the Clean Water Act; (2) Prohibit illicit discharges to the city stormwater management systems and facilities and receiving waters; (3) Control to the maximum extent practicable the discharge to the City stormwater management systems and facilities and receiving waters of spills, dumping, or disposal of materials other than stormwater; (4) Address specific categories of non-stormwater discharges and similar other incidental non-stormwater discharges listed in the SWMP; (5) Require erosion and sediment controls to protect water quality on all applicable new and re-development projects both during and after construction; (6) Where necessary, require stormwater discharge rate and volume controls during and following construction, development, or re-development activities; (7) Define and implement procedures for stormwater site plan review and stormwater site inspections of all applicable construction, development, and re-development projects within the city; (8) Control the discharge from the city stormwater management systems and facilities and receiving waters of pollutants in such quantity that water quality standards are met or to otherwise address post-construction, post-development, post-re-development, and long-term water quality, including the necessary means needed to comply with state and federal regulations regarding stormwater management quantity and quality; (9) Define procedures for addressing citizen complaints of stormwater-related issues within the city; (10) Provide for adequate long term operation and maintenance of best management practices (BMPs); (11) Prior to any approval of construction, development, or re-development activities within the city, require a letter from DHEC's Office of Ocean and Coastal Resource Management that states the proposed project is consistent with the Coastal Zone Management Act; (12) Carry out inspection, surveillance, and monitoring procedures necessary to determine compliance and noncompliance with approved construction activity application conditions including the prohibition on illicit discharges to the city stormwater management systems and facilities and receiving waters; (13) Encourage the use of non-traditional strategies to control stormwater discharges; (14) Encourage the creation of riparian buffers and preservation of natural spaces to provide areas that could be used for flood storage, stormwater treatment and control, and recreation. Such areas may be required in special protection areas needed to protect, maintain, or enhance water quality and protect property from flooding problems; (15) Develop, implement, and enforce action plans to address pollutant load reductions required in impaired waterbodies and to work towards compliance with total maximum daily loads (TMDLs) established by the EPA or the SCDHEC and to work towards meeting water quality standards; and (16) Provide for the enforcement of the Stormwater Management Article. (c) Further, it is the purpose of this article to establish review authority for the city's department of stormwater management and the city's public works and utilities committee for establishing consistency of construction, development, and re-development projects with the city's SWMP.
(Ord. No. 2007-158, § 2, 8-21-07; Ord. No. 2018-150, § 1, 11-27-18)
Ask a question about Charleston law
Corpus searches the Charleston sections it holds and shows the ones that match, with their citations. Free, no sign-in.
