§ 20-271 — Grading and drainage regulations; completion of work

Peoria, Arizona, City Code (2026 S-10: Local legislation current through Ord. 2026-20, passed 10-6-26) · Peoria, Ariz., City Code § 20-271

Corpus is an independent public-information project, not the official City of Peoria website. Stable reference: corpuslaw.us/code/abc8ec6c-0bad-42d6-b8dd-6b24b6dceeb0

Sec. 20-271. Grading and drainage regulations; completion of work.

(a) Final Reports. Upon completion of the work, the Engineering Director may require the following reports: (1) Certification by the supervising engineer that all grading, lot drainage, and drainage facilities have been completed in conformance with the approved plans and this chapter. (2) A soils engineering report including certifications of soil bearing capacity of compacted fills, summaries of field and laboratory tests and locations of tests. (3) An engineering geology report based on the final construction. It shall include specific approval of the grading as affected by geological factors. Where necessary, a revised geologic map and cross sections, and any recommendations regarding building restrictions or foundation setbacks, shall be included. (b) Notification of Completion. The permittee or his agent shall notify the Engineering Director when the grading operation is ready for final inspection. Final approval shall not be given until all work, including installation of all drainage structures and their protective devices, have been completed and required reports have been submitted. (Ord. No. 98-95, enacted, 8/26/98; Ord. No. 02-41, 6/7/02, amended (SUPP 2002-2))