Sec. 20-36. Completion of Well.
Upon completion of the well, including performance of all production tests required by the Texas Railroad Commission as a precondition to issuance of a production allowable, the Permittee shall verbally notify the City Engineer as soon as possible thereafter, and shall formally certify completion of the well to the City by filing duplicates of Railroad Commission-required completion forms G-1 (gas well) or W-2 (oil well), or their successor forms, with the City within ten (10) days following the filing of same with the Railroad Commission. (Ord. No. 0-2000-86, 11/1/00) (0-2008-45, 3/26/08)
Ask a question about Tyler law
Corpus searches the Tyler sections it holds and shows the ones that match, with their citations. Free, no sign-in.