For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 20-36 — Completion of Well

Code of Ordinances of the City of Tyler, Texas (September 2026: including amendments through September 9, 2026) · Tyler City Code § 20-36

Corpus is an independent public-information project, not the official City of Tyler website. Stable reference: corpuslaw.us/code/abd0c32c-c230-45c2-86ab-19f69ddb6e29

Sec. 20-36. Completion of Well.

Upon completion of the well, including performance of all production tests required by the Texas Railroad Commission as a precondition to issuance of a production allowable, the Permittee shall verbally notify the City Engineer as soon as possible thereafter, and shall formally certify completion of the well to the City by filing duplicates of Railroad Commission-required completion forms G-1 (gas well) or W-2 (oil well), or their successor forms, with the City within ten (10) days following the filing of same with the Railroad Commission. (Ord. No. 0-2000-86, 11/1/00) (0-2008-45, 3/26/08)

Ask a question about Tyler law

Corpus searches the Tyler sections it holds and shows the ones that match, with their citations. Free, no sign-in.