Sec. 25-22. Water; construction water access. Applicability.

Any customer requesting construction water shall file/complete an application with the City Customer Service Center. The request to use water for construction shall be filed prior to any water being used for construction. The City Finance Department will prepare a separate billing for each service connection used to supply water for construction, if such request has been approved. (a) A Hydrant Meter & Backflow Device Application for construction water access shall include a water use summary with the following information: (1) location of project, (2) duration of requested water access and (3) estimate of monthly water usage, (4) acceptance of Hydrant Meter Conditions of Service and accompanied by a deposit equal to the amount set forth by City Council. The water use summary may be reviewed by the Water Services Director who reserves the right of denial for any construction water access or termination of use of construction water for any inappropriate use of construction water. Upon approval, access to the City water distribution system shall be provided only at those locations approved by theWater Services Director. The Water Services Director shall have the authority to limit access to construction water to certain dates and times under any permit issued or limit or suspend entirely access to construction water. (b) City-owned hydrants shall be metered for all construction water sold by the City. Any customer or property owner who has obtained potable, recharged, reclaimed or other water owned by the City that has not passed through a meter, or City approved calculating method, shall be subject to imposition of a Civil Sanction by the Water Services Director in the amount of One Thousand Dollars ($1,000.00) in accordance with the provisions of this Chapter. Each day such a violation occurs shall be deemed a separate violation for purposes of this Section and shall subject the property owner to a separate Civil Sanction in the amount provided by this Section. (c) It shall be a violation of any construction water access approval and a violation of this code to open or operate any fire hydrant without the appropriate backflow device and meter or to draw or to attempt to draw, injure, damage or tamper with a fire hydrant. Authorization to utilize a fire hydrant shall be granted by the Water Services Director. Operation of fire hydrant turn nuts shall only be completed by authorized City personnel. In addition to the other provisions of this Section, the Water Services Director may immediately revoke the approval for construction water use and remove the meter and all equipment accessing the City system and charge the property owner for the expense of such removal, together with an administrative fee of twenty percent (20%). (d) For each service connection used to supply water for construction, there shall be a minimum charge in an amount as set forth in this code. The minimum charge shall be billed once a month. (e) The customer or property owner will be held responsible for all water used from the date the hydrant meter is placed until the account is closed. At that time a final billing will be prepared. (Ord. No. 92-03, 2/11/92, Enacted; Ord. No. 07-37, 11/20/07, Repealed existing Sec. 25-22; Enacted new Sec. 25-22 (SUPP 2007-4); Ord. No. 2017-36, § 12, 6-13-17; Ord. No. 2026-01, § 9, 1-13-26)

Ask a question about Peoria law

Corpus searches the Peoria sections it holds and shows the ones that match, with their citations. Free, no sign-in.