§ 5-107.3 — Examination of documents
Code of Ordinances, City of Tampa (Supp. No. 148: codified through Ordinance No. 2025-152, enacted December 18, 2025) · Tampa City Code § 5-107.3
Corpus is an independent public-information project, not the official City of Tampa website. Stable reference: corpuslaw.us/code/ac982f90-6a52-41d7-925c-d3bd8e57eebf
Sec. 5-107.3. - Examination of documents.
5-107.3.4. Design professional in responsible charge. Where it is required that documents be prepared by a registered design professional, the building official shall be authorized to require the owner or the owner's authorized agent to engage and designate on the building permit application a registered design professional who shall act as the registered design professional in responsible charge. If the circumstances require, the owner or the owner's authorized agent shall designate a successor registered design professional in responsible charge who shall perform the duties required of the original registered design professional in responsible charge. The building official shall be notified in writing by the owner or owner's authorized agent if the registered design professional in responsible charge is changed or is unable to continue to perform the duties. Successor registered design professional in responsible charge licensed under F.S. Ch. 471, shall comply with F.S. § 471.025(4), and the procedure set forth in 61G15-27.001 Florida Administrative Code; or licensed under F.S. Ch. 481, shall comply with F.S. § 481.221(6) and the procedure set forth in 61G1-18.002 Florida Administrative Code. The registered design professional in responsible charge shall be responsible for reviewing and coordinating submittal documents prepared by others, including phased and deferred submittal items, for compatibility with the design of the building. 5-107.3.4.1. Deferred submittals. For the purposes of this section, deferred submittals are defined as those portions of the design that are not submitted at the time of the application and that are to be submitted to the building official prior to final completion of the permit. Deferral of any submittal items shall have the prior approval of the building official. The registered design professional in responsible charge shall list the deferred submittals on the construction documents for review by the building official. Documents for deferred submittal items shall be submitted to the registered design professional in responsible charge who shall review them and forward them to the building official with a notation indicating that the deferred submittal documents have been reviewed and found to be in general conformance to the design of the building. The deferred submittal items shall not be installed until the deferred submittal documents have been approved by the building official. 5-107.3.5. Minimum plan review criteria for buildings. The examination of the documents by the building official shall include the following minimum criteria and documents: a floor plan, site plan, foundation plan, floor/roof framing plan or truss layout; all fenestration and building envelope penetrations; flashing; and rough opening dimensions; and all exterior elevations. All site and building plans shall be drawn to scale. Commercial buildings: Building: 1. Site requirements Parking layout Fire access Vehicle loading Driving/turning radius Fire hydrant/water supply/post indicator valve (PIV) Zoning requirements Setback/separation (assumed property lines) Buffer requirements Site utilities Location of specific tanks, water lines and sewer lines Stormwater requirements Drainage layout (ponds, outfall, elevations, etc.) Landscape requirements Trees and plants Landscape buffers Green space requirements Solid waste Dumpster location Flood hazard areas, flood zones, and design flood elevations 2. Occupancy group and special occupancy requirements shall be determined. 3. Minimum type of construction shall be determined (Table 503, Florida Building Code). 4. Fire-resistant construction requirements shall include the following components: Fire-resistant separations Fire-resistant protection for type of construction Protection of openings and penetrations of rated walls Fire blocking and draft stopping and calculated fire resistance 5. Fire suppression systems shall include: Early warning smoke evacuation systems Schematic fire sprinklers Stand pipes Pre-engineered systems Riser diagram 6. Life safety systems shall be determined by the building official and shall include the following requirements: Occupant load and egress capacities Early warning Smoke control Stair pressurization Systems schematic 7. Occupancy load/egress requirements shall include: Occupancy load Gross Net Means of egress Exit access Exit Exit discharge Stairs construction/geometry and protection Doors Emergency lighting and exit signs Specific occupancy requirements Construction requirements Horizontal exits/exit passageways 8. Structural requirements shall include: Soil conditions/analysis Termite protection Design loads Wind requirements Building envelope Impact-resistant coverings or systems Structural calculations (if required) Foundation Flood requirements in accordance with Section 1612, including lowest floor elevations, enclosures, flood damage-resistant materials. Wall systems Floor systems Roof systems Threshold inspection plan Stair systems 9. Materials shall be reviewed and shall at a minimum include the following: Wood Steel Aluminum Concrete Plastic Glass Masonry Gypsum board and plaster Insulating (mechanical) Roofing Insulation Building envelope portions of the Energy Code (including calculation and mandatory requirements) 10. Accessibility requirements shall include the following: Site requirements Accessible route Vertical accessibility Toilet and bathing facilities Drinking fountains Equipment Special occupancy requirements Fair housing requirements 11. Interior requirements shall include the following: Interior finishes (flame spread/smoke develop) Light and ventilation Sanitation 12. Special systems Elevators Escalators Lifts 13. Swimming pools Barrier requirements Spas Wading pools 14. Location and installation details. The specific location and installation details of each fire door, fire damper, ceiling damper, and smoke damper shall be shown and properly identified on the building plans by the designer. Electrical: 1. Electrical Wiring Services Feeders and branch circuits Overcurrent protection Grounding Wiring methods and materials GFCI's Electrical portions of the Energy Code (including calculation and mandatory requirements) 2. Equipment 3. Special occupancies 4. Emergency systems 5. Communication systems 6. Low voltage 7. Load calculations 8. Design Flood Elevation Plumbing: 1. Minimum plumbing facilities 2. Fixture requirements 3. Water supply piping 4. Sanitary drainage 5. Water heaters 6. Vents 7. Roof drainage 8. Backflow prevention 9. Irrigation 10. Location of water supply line 11. Grease traps 12. Environmental requirements 13. Plumbing riser 14. Design flood elevation 15. Water/plumbing portions of the Energy Code (including calculation and mandatory requirements) Mechanical: 1. Mechanical portions of the energy calculations 2. Exhaust systems Clothes dryer exhaust Kitchen equipment exhaust Specialty exhaust systems 3. Equipment 4. Equipment location 5. Make-up air 6. Roof-mounted equipment 7. Duct systems 8. Ventilation 9. Combustion air 10. Chimneys, fireplaces and vents 11. Appliances 12. Boilers 13. Refrigeration 14. Bathroom ventilation 15. Laboratory 16. Design flood elevation 17. Smoke and/or fire dampers Gas: 1. Gas piping 2. Venting 3. Combustion air 4. Chimneys and vents 5. Appliances 6. Type of gas 7. Fireplaces 8. LP tank location 9. Riser diagram/shut offs 10. Design flood elevation 11. Gas portions of the Energy Code (including calculation and mandatory requirements) Demolition: 1. Asbestos removal Residential (One- and Two-Family) Buildings: 1. Site requirements Buffer requirements Site utilities Location of septic tanks, water lines and sewer lines Zoning requirements Setback/separation (assumed property lines) Stormwater requirements Drainage layout (ponds, outfall, elevations, etc.) Landscape requirements Trees and plants Landscape buffers Green space requirements Flood hazard areas, flood zones, and design flood elevations 2. Fire-resistant construction (if required) 3. Fire 4. Smoke and/or carbon monoxide alarm/detector locations 5. Egress window size and location of stairs construction requirements 6. Structural requirements shall include: Termite protection Design loads Wind requirements Wall section from foundation through roof, including assembly and materials Connector tables Foundation Floor systems Roof systems Structural calculations (if required) 7. Accessibility requirements: Show/identify accessible bath 8. Impact-resistant coverings or systems 9. Residential Energy Code submittal (including calculation and mandatory requirements) Manufactured Building/Housing: 1. Site requirements Setback/separation (assumed property lines) Location of septic tanks 2. Structural Wind zone Anchoring Blocking 3. Plumbing List potable water source and meter size (if applicable) 4. Mechanical Exhaust systems Clothes dryer exhaust Kitchen equipment exhaust 5. Electrical exterior disconnect location Exemptions: Plan examination by the building official shall not be required for the following work: 1. Replacing existing equipment such as mechanical units, water heaters, etc. 2. Re-roofs. 3. Minor electrical, plumbing and mechanical repairs. 4. Annual maintenance permits. 5. Prototype plans, except for local site adaptations, siding, foundations and/or modifications or for structures that require a waiver. 6. Manufactured building plans except for foundation plans and modifications of buildings on site and as listed above in manufactured buildings/housing.
(Ord. No. 2024-15, § 2(Exh. A), 2-1-2024)
Ask a question about Tampa law
Corpus searches the Tampa sections it holds and shows the ones that match, with their citations. Free, no sign-in.
