For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 118-212 — Publication of users in significant noncompliance

Code of the City of Charleston, West Virginia (Supp. No. 56: codified through Bill No. 8069, enacted March 16, 2026) · Charleston, W. Va., City Code § 118-212

Corpus is an independent public-information project, not the official City of Charleston website. Stable reference: corpuslaw.us/code/acb7a050-13b7-43c2-ba20-e5060e701322

Sec. 118-212. - Publication of users in significant noncompliance.

(a) The board shall publish annually, in the largest daily newspaper of the city, a list of the users which, at any time during the previous 12 months, were in significant noncompliance with applicable pretreatment standards and requirements. The term "significant noncompliance" shall be applicable to all significant industrial users (or any other industrial user that violates paragraphs (3), (4) or (8) of this section) and shall mean: (1) Chronic violations of wastewater discharge limits, defined here as those in which 66 percent or more of all the measurements taken for the same pollutant parameter taken during a six month period exceed (by any magnitude) a numeric pretreatment standard or requirement, including instantaneous limits; (2) Technical review criteria (TRC) violations, defined here as those in which 33 percent or more of all the measurements taken for each pollutant parameter taken during a six-month period equal or exceed the product of the daily maximum limit on the average limit multiplied by the applicable TRC (1.4 for BOD, TSS, fats, oils and grease, and 1.2 for all other pollutants except pH); (3) Any other violation of an industrial user discharge permit effluent limit or of a pretreatment standard or requirement as defined by section 118-201 that the general manager determines has caused, alone or in combination with other discharges, interference or pass through, including endangering the health of potw personnel or the general public; (4) Any discharge of a pollutant that has caused imminent endangerment to the public or to the environment, or has resulted in the board's exercise of its emergency authority to halt or prevent such a discharge; (5) Failure to meet, within ninety calendar days of the scheduled date, a compliance schedule milestone contained in an industrial user discharge permit or enforcement order for starting construction, completing construction, or attaining final compliance; (6) Failure to provide within 45 calendar days after the due date, any required reports, including baseline monitoring reports, reports on compliance with categorical pretreatment standard deadlines, periodic self-monitoring reports, and reports on compliance with compliance schedules; (7) Failure to accurately report noncompliance; or (8) Any other violation(s), which may include a violation of best management practices, which the board determines will adversely affect the operation or implementation of the local pretreatment program.

(Ord. No. 7596, 9-16-2013)

Ask a question about Charleston law

Corpus searches the Charleston sections it holds and shows the ones that match, with their citations. Free, no sign-in.