§ 49-1725 — Pipe boring technique and materials

Omaha Municipal Code (Supp. No. 100, Update 2: codified through Ordinance No. 44760, enacted August 4, 2026) · Omaha Municipal Code § 49-1725

Corpus is an independent public-information project, not the official City of Omaha website. Stable reference: corpuslaw.us/code/add0026d-9518-4b26-a972-3f76a686f20c

Sec. 49-1725. - Pipe boring technique and materials.

(a) The plumbing inspector shall observe the insertion of any pipe through holes bored underground. There shall be unrestricted insertion of the pipe through the hole. If the inspector believes excessive force has been applied to the pipe during insertion, an air test shall be performed on the portion of pipe installed through the hole. If the test fails, the pipe shall be removed. (b) The size of the holes bored for the insertion of any pipe shall not be any larger than 1.5 times the size of the pipe for sizes ten inches and smaller and 1.3 times the size of the pipe for sizes larger than ten inches. If the hole is oversized, the void around the pipe must be mud-jacked in the presence of a plumbing inspector or ductile iron pipe must be installed. (c) In a plumbing inspector's presence, all piping shall be flushed with water and videoed to verify a successful installation. Exception: Sewer pipe installations less than 75 feet long with a fall of one-half inch per foot or more will not be required to be flushed or videoed.

(Ord. No. 40524, § 1, 10-20-15)