Sec. 10-163. - Fee schedule; bond for payment of fees.
(a) Fee schedule. Before a permit shall be granted for the construction or alteration of a plumbing or drainage system, the applicant shall pay to the city an inspection fee in accordance with the following schedule:
(1) Fees for new residential construction established by subsection 10-31(a)(2) shall apply as applicable.
(2) Nonresidential construction. For nonresidential construction and alterations, additions and repairs to existing residential buildings the following fees shall apply:
a. Plumbed fixtures, appliances, interceptors and sewer ejectors to be installed or replaced, including but not limited to sinks, water closets, floor drains, dishwashers, disposals and water heaters, each .....$10.00
b. Installation or replacement of building sewer or drains, per 200 feet or part thereof .....16.00
c. Installation or replacement of building water lines when not in conjunction with one of the items listed in subsection (2)a or (2)b of this section .....100.00
d. Installation or replacement of gas outlets or gas house connections, each .....8.00
e. Installation of medical gas, per station outlet .....10.00
f. Minimum fee: The total of fees due for any permit shall be not less than .....75.00
g. Plumbing changeout permits (includes electrical) .....Flat fee of $100.00
(b) Contractor's bond for payment of fees.
(1) Cash bond. Licensed plumbing contractors, in lieu of paying their inspection fees daily, may deposit a cash bond with the director of finance in an amount not less than an average month's fees paid by such contractor during the previous year, and in no case shall it be less than $100.00. Inspection permits may be issued against this bond up to the full amount, but in no case will credit be extended beyond the amount of the bond. If payment is not made within five days after submission by the inspections division of the bill for inspection fees for the previous period, the cash bond shall be forfeited and applied against the permits outstanding. Any balance left of the bond will be returned to the contractor.
(2) Surety bond. Licensed plumbing contractors, in lieu of paying their inspection fees daily, may file with the director of finance a contractor's license bond written by a surety company, approved by the state department of insurance to do business in the state, to be held as surety for the payment of fees. Such bond shall be in an amount of not less than $2,500.00. Inspection permits may be issued based on the posting of this bond up to the full amount, but in no case will credit be extended beyond the amount of the bond. Contractors will be billed monthly. Payment will be due in ten days and delinquent in 25 days. No further permits will be issued to delinquent accounts, regardless of the amount of the bond. If payment is not received in 60 days, the bond will be executed for the amount of the bill. The bond may also meet the requirement for the posting of a bond when required by section 10-164.
(3) Bonded account setup and maintenance fee. Any account which is not paid within 30 days of the billing date will be charged a late fee of two percent of the outstanding balance.
There will be a reasonable charge assessed to establish a bonded account and a reasonable yearly maintenance charge for continuation of the account.
There will be a reasonable charge assessed for foreclosure of a delinquent bonded account.
(c) Applicability of fees to work on existing installations. The fees prescribed in subsection (a) of this section shall apply to all old work as well as new, and to inspections made necessary by moving any house or structure from one location to another, or by razing the house or structure, and shall apply when it is necessary for any reason to set, reset or replace any fixture, hot water storage tank or water heater.
(Code 1975, § 4-70; Ord. No. 4401, § 4, 9-17-01; Ord. No. 4453, §§ 9, 10, 5-19-03; Ord. No. 4497, § 7, 6-22-04; Ord. No. 4793, § 6, 6-17-13; Ord. No. 24-0369, § 4, 6-17-24)