§ 74.260 — Wastewater permit application contents
Salem Revised Code, City of Salem, Oregon (Supp. No. 26: codified through Ordinance No. 10-26, adopted August 10, 2026) · Salem Revised Code § 74.260
Corpus is an independent public-information project, not the official City of Salem website. Stable reference: corpuslaw.us/code/ae0447fe-4218-4a6d-9035-c77ad149b264
Sec. 74.260. - Wastewater permit application contents.
(a) All industrial users required to have a permit must submit the following information on an application form approved by the Director: (1) The user's name, mailing address, and, if different from the user's mailing address, the location of the facility; (2) Environmental control permits held by or for the facility; (3) Standard Industrial Classification Codes for the pretreatment industry as a whole and any processes for which categorical pretreatment standards have been promulgated; (4) Description of activities, facilities, and plant processes at the facility, including a list of all raw materials and chemicals which are or could be accidentally or intentionally discharged to the municipal wastewater system; (5) Number and type of employees, hours of operation of the facility, and proposed or actual hours of operation of the pretreatment system; (6) Each product by type, amount, process or processes, and rate of production; (7) Type and amount of raw materials processed, as averages and maximums per day; (8) The site plans, floor plans, and mechanical and plumbing plans and details to show all sewers, floor drains, and appurtenances by size, location and elevation, and all points of discharge at the facility; (9) Time and duration of discharges; (10) Measured average daily and maximum daily flow, in gallons per day, into the municipal wastewater system from regulated process streams and other streams, as necessary for the use of the combined waste stream formula in 40 CFR 403.6(e); (11) Daily maximum, daily average, and monthly average wastewater flow rates, including daily, monthly, and seasonable variations, if any; (12) Wastewater constituents and characteristics, including any pollutants in the discharge which are limited by pretreatment standards or pretreatment requirements, the pretreatment standards or pretreatment requirements applicable to each regulated process, and the nature and concentration of regulated pollutants in each regulated process, or mass and daily maximum and average concentration or mass when required by a pretreatment standard. Sampling and analysis shall be undertaken in accordance with 40 CFR 136; (13) A statement by the industrial user's authorized representative indicating the pretreatment standards and pretreatment requirements are being met for existing sources or will be met for new sources on a consistent basis and, if not, what additional pretreatment is necessary; (14) If additional pretreatment and/or operations and maintenance will be required to meet the pretreatment standards or pretreatment requirements, then the industrial user shall indicate the shortest time schedule necessary to accomplish installation or adoption of such additional pretreatment and/or operations and maintenance. The completion date in this schedule shall not be longer than the compliance date established for the applicable pretreatment standard or pretreatment requirement. The following conditions shall apply to this schedule: (A) No increment set forth in this schedule shall exceed nine months, nor shall the total compliance period exceed 36 months; (B) Progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment facilities required of the user to meet the applicable pretreatment standards and pretreatment requirements, including, but not limited to, hiring an engineer, completing preliminary plans, completing final plans, executing contracts for major components, commencing construction, completing construction, beginning operation, and conducting routine operation; and (C) No later than 14 days following each date in the schedule and the final date for compliance, the industrial user shall submit a progress report to the Director, including, at a minimum, whether or not the user has complied with the progress increment, the reason for any delay, and, if appropriate, the steps being taken by the user to return to the established schedule. In no event shall more than nine months elapse between any progress report to the Director; (15) Any other information deemed necessary to evaluate the permit application. (b) Incomplete or inaccurate applications will not be deemed complete, and will be returned to the industrial user for correction or revision.
(Prior Code, § 74.260; Ord. No. 13-96; Ord. No. 65-2002)
Ask a question about Salem law
Corpus searches the Salem sections it holds and shows the ones that match, with their citations. Free, no sign-in.
