SANITARY SEWERS; DESIGN, CONSTRUCTION, AND INSPECTION
Mesa City Code § 8-4-7
in effect8-4-7: - SANITARY SEWERS; DESIGN, CONSTRUCTION, AND INSPECTION
(A) The City shall have the authority to approve the design, issue permits, and conduct inspections of sewer facilities that are to be connected to the City's existing sanitary sewer system.
(B) The design and construction of all sanitary sewers under the jurisdiction of the City must conform to the standard sewer design and construction specifications as identified in the Maricopa Association of Governments Specifications, Mesa Standard Details, and the Arizona Department of Environmental Quality Bulletin No. 11.
(C) All sewers to be attached directly or indirectly to the POTW shall be inspected by personnel of the City during construction. The City shall be notified at least forty-eight (48) hours prior to cutting into the POTW. In making a connection to the POTW, no physical alteration shall commence until an inspector is present. No wastewater shall be discharged into the POTW prior to obtaining City approval of sewer construction.
(D) Following satisfactory completion of construction, the City will issue a construction inspection certificate upon request.
(Ord. No. 5959, § 2, 8-25-25)
Source: City of Mesa, Arizona, Mesa City Code and City Charter (Municode Library, library.municode.com)URL: https://library.municode.com/az/mesa/codes/code_of_ordinances?nodeId=COOR_TIT8HESAEN_CH4SASERE_8-4-7SASEDECOINFetched: 11/1/2026
