§ 10.1.6 — Plat approval

Code of Ordinances, City of Cape Coral, Florida (Supp. No. 39, Update 1; codified through Ordinance No. 45-26, enacted September 3, 2026) · Cape Coral Land Development Code § 10.1.6

Corpus is an independent public-information project, not the official City of Cape Coral website. Stable reference: corpuslaw.us/code/af8aaaf7-6da7-498f-b40f-8ad51786762d

Section 10.1.6 - Plat approval.

A. Plat approval procedures. Plats must be prepared in accordance with F.S. Ch. 177, Part 1, and the City of Cape Coral Technical Requirements for Plat Approval, which are hereby incorporated by reference. The preliminary plat must be submitted during the SCP review. SCP approval will not be granted prior to approval of the preliminary plat. The Final Plat shall incorporate all changes or modifications resulting from the review of the SCP and any remaining conditions or requirements of the PSP or MCP approval. B. Review Process. Application review and approval follows the administrative review procedure as established in Article 3 of this Code. C. Supplemental information required for plat review. 1. Operation and maintenance covenants. Where applicable, a copy of the covenants used for the maintenance and operation of the infrastructure improvements required by this Code including private streets and adjacent drainage, drainage and storm water management systems, utilities, public water and sewage systems, on-site bikeways, on-site pedestrian ways, open space, parks, recreation areas, and buffers. These documents must meet the criteria set forth in the City of Cape Coral Technical Requirements for Plat Approval. 2. Articles of incorporation and bylaws or other legal documents for assignment of maintenance. The developer must submit a copy of the legal documents creating the legal mechanism to ensure that the drainage system, on-site bikeways, on-site pedestrian ways, roadways and rights-of-way are continuously maintained. These documents must meet the requirements set forth in the City of Cape Coral Technical Requirements for Plat Approval. D. After the final plat has been approved and certified by the Community Development Director, the City Surveyor, and the City Attorney that it complies with all applicable requirements of this Code, the Director or his designee shall have approve the plat. E. Revisions after final plat approval by the Director and prior to recordation. 1. Recording information for the property or home owner's association documents may be added to the plat at the time of recording of the documents. 2. Any other changes, erasures, modifications, or revisions to an approved plat prior to recordation may only be made by the Community Development Director to correct scrivener's errors. No such request shall be considered unless made by the preparer of the plat. 3. No other changes, erasures, modifications, or revisions may be made to an approved final plat prior to recordation unless a new application and fee are submitted for review and approval. F. Approval of the Plat by the city shall not constitute acceptance by the city of the dedication of any public street, other public way, easement, or improvement or the responsibility to construct or maintain any improvements unless so indicated in the dedication on the plat. G. Recording. The approved plat shall be recorded with Lee County Clerk of Circuit Court within 20 days of receiving the approved plat from the city. After recordation of the plat, the developer shall provide to the Community Development Director a full size certified copy of the recorded plat. H. Building permits. No building permits for residential or residential accessory structures shall be issued until the final plat has been recorded and all subdivision improvements have either been completed or sufficient assurance of completion has been reviewed and approved by the City Attorney. I. Phasing. The applicant may construct the proposed development and record plats for any phase approved on the PSP or MCP. The phases shall have been specified on the approved Preliminary Subdivision Plan and shall be of such a size and design that all phases completed at any time can exist independently as a subdivision in complete conformity with the requirements of this article. Any change in the sequence of phases must receive prior approval by the Development Services Manager. If PSP or MCP is phased, the applicant shall have the option of platting one or more of the development phases in a single plat in conformity with all the procedures and requirements of this article.

(Ord. 51-25, § 2, 11-19-2025)