For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 33.475.450 — Corrections to Violations of the River Environmental Overlay Zone Regulations

Portland City Code (non-zoning titles; Title 33 separately); partial · Portland Zoning Code § 33.475.450

Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/af8cd8a3-5bc2-4ae2-b434-d276670febab

33.475.450 Corrections to Violations of the River Environmental Overlay Zone Regulations

A. Purpose. The purpose of the correction regulations is to ensure the timely restoration of natural resources and functional values that have been degraded due to a violation of the River Environmental overlay zone. These regulations establish a process to determine which review requirements will be applied to remedy a violation that takes place in the River Environmental overlay zone. The type of review required depends on the circumstances of the violation. Section 33.475.450.B details methods for correcting such violations and Title 3 of the City Code details the enforcement penalties. B. Correction Options. Applicants must choose one of the following options to correct a river environmental code violation. 1. When these options may be used. a. If all of the following are met, the applicant may choose Option One, Option Two, or Option Three: (1) No more than 12 diameter inches of trees were removed; (2) No ground disturbance occurred riverward of the top of bank of the Willamette River, in the riparian buffer area, or within 30 feet of a wetland or the top of bank of a stream or other water body. See Map 475-2 for top of bank; (3) The correction will remove all illegal development; and (4) The correction will replant illegal clearing. b. If any of the following occurred, the applicant may not use Option One, but may choose either Option Two or Option Three: (1) More than 12 diameter inches of trees were removed; (2) A Madrone, Garry Oak, or Pacific Yew larger than 3 inches was removed; or (3) Disturbance occurred riverward of the top of bank of the Willamette River, or within 30 feet of a wetland or the top of bank of a stream or other water body. See Map 475-2 for top of bank. See Map 475-2 for top of bank.; c. If the applicant cannot meet Options One or Two, Option Three must be used. d. If the violation occurred within the riparian buffer area, the applicant must use Option Three. See Map 475-6 for the riparian buffer area. e. If the violation also violates a condition of approval of a land use review, no trees have been removed, and disturbance did not occur riverward of the top of bank of the Willamette River or within 30 feet of a wetland or of the top of bank of a stream or other water body, the applicant may choose Option One or the process described in Section 33.730.140. The applicant may not choose Options Two or Three. f. If the violation also violates a condition of approval of a land use review, trees have been removed, and disturbance occurred riverward of the top of bank of the Willamette River or within 30 feet of a wetland or the top of bank of a stream or other water body, the applicant must use the process described in Section 33.730.140. The applicant may not choose one of the options in this section. 2. Option One, Remove and Repair. This option results in removal of illegal development and replanting and repair of any damage. All of the requirements of this paragraph must be met. Adjustments and modifications to these requirements are prohibited. a. All items, materials, and fill placed in the area of violation are removed and no new disturbance area is created; b. Any soil compaction resulting from the violation is tilled or otherwise broken up to a depth of 6 inches prior to planting; c. Violation remediation planting. The area to be planted is the area disturbed by the violation. All of the following must be met: (1) The area disturbed by the violation activity must be replanted to meet the standards of Table 475-3; (2) For planting areas over 600 square feet, at least two different tree species and sizes, three different shrub species, and four different groundcover species must be used. All plants must be native; (3) A second area, equal in size to the area disturbed by the violation activity, must also be replanted to meet the standards of Table 475-3; (4) Any Nuisance or Prohibited Plants listed on the Portland Plant List must be removed from the planting area and within 10 feet of the planting area; (5) Trees must be a minimum ½ inch in diameter, bareroot or live stake, unless they are oak, madrone, or conifer, which may be three- to five-gallon size. No more than 10 percent of the trees may be oak or madrone. Trees must not be planted within a Scenic overlay zone. Trees may be clustered. Shrubs must be a minimum of two-gallon size. All other species must be a minimum of four-inch pots; (6) The requirements of Section 33.248.090, Mitigation and Restoration Planting, must be met; and (7) For violations involving the removal of trees, two times the number of diameter inches removed must be planted on the site, in addition to other remediation vegetation planted. If any tree removed was a Garry Oak, Madrone, or Pacific Yew, the replacement trees must be of the same species. Planted trees must be a minimum ½ inch in diameter unless they are oak, Madrone, or conifer, which may be three- to five-gallon size. 3. Option Two, Retain and Mitigate. This option results in legalizing the illegal development and mitigating for any damage. All of the requirements of this subsection must be met. Adjustments and modifications to these standards are prohibited. a. The applicable standards of paragraphs 33.475.440 must be met; and b. Violation remediation planting. The area to be planted is the area disturbed by the violation. Where development is approved for the area disturbed by the violation, an area of the same size elsewhere on the site must be planted. All of the following must be met: (1) The area disturbed by the violation activity must be replanted to meet the standards of Table 475-3; (2) For planting areas over 600 square feet, at least two different tree species and sizes, three different shrub species, and four different groundcover species are used. Plants must be native and selected from the Portland Plant List. (3) A second area, equal in size to the area disturbed by the violation activity, must also be replanted to meet the standards of Table 475-3; (4) Any Nuisance or Prohibited Plants listed on the Portland Plant List must be removed from the planting area and within 10 feet of the planting area; (5) Trees must be a minimum ½ inch in diameter, bareroot or live stake, unless they are oak, madrone, or conifer, which may be three- to five-gallon size. No more than 10 percent of the trees may be oak or madrone. Trees must not be planted within a Scenic overlay zone. Trees may be clustered. Shrubs must be a minimum of two-gallon size. All other species must be a minimum of four-inch pots; and (6) The requirements of Section 33.248.090, Mitigation and Restoration Planting, must be met. When the planting area exceeds 1,000 square feet, written proof that all specifications of 33.248.090 have been met must be provided annually for three years after planting is complete. The requirement for three years of written proof does not apply when the planting area is less than 1,000 square feet. In this case, written proof that all specifications of 33.248.090 have been met must be provided one year after the planting is complete. The property owner must provide this documentation to Portland Permitting & Development; and c. For violations involving the removal of trees, two times the number of diameter inches removed must be planted on the site, in addition to other remediation vegetation planted. If any tree removed was a Garry Oak, Madrone, or Pacific Yew, the replacement trees must be of the same species. Planted trees must be a minimum ½-inch in diameter unless they are oak, Madrone, or conifer, which may be three- to five-gallon size. 4. Option Three, River Review. This option requires River Review, using the approval criteria and procedures below: a. Approval criteria. The applicable approval criteria of Subsection 33.865.120 must be met. b. Review procedures. Reviews are processed as follows: (1) Type III. A Type III review is required for any development, exterior alteration, or exterior improvement within a wetland, stream channel, drainageway, or water body. (2) Type II. All other reviews to correct violations are processed through a Type II procedure. (3) All River Reviews must provide the information required in Section 33.865.040, Supplemental Application Requirements. Clean Up of Contaminated Sites

Ask a question about Portland law

Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.