§ 2-67 — Land development inspection
Code of Ordinances, City of Southaven, Mississippi (Supp. No. 70: codified through Resolution of June 2, 2026) · Southaven Code of Ordinances § 2-67
Corpus is an independent public-information project, not the official City of Southaven website. Stable reference: corpuslaw.us/code/af92e7ab-5964-44cf-a19d-cabc6ca55c91
Sec. 2-67. - Land development inspection.
(a) Right-of-entry for inspection. When any new drainage control facility is installed on private property, or when any new connection is made between private property and a public drainage control system, sanitary sewer or combined sewer, the property owner shall grant to the AEA the right to enter the property at reasonable times and in a reasonable manner for the purpose of inspection. This includes the right to enter a property when it has a reasonable basis to believe that a violation of this title is occurring or has occurred, and to enter when necessary for abatement of a public nuisance or correction of a violation of this title. (b) Inspection. The AEA or designated agent shall make inspections as hereinafter required and shall either approve that portion of the work completed or shall notify the permitee wherein the work fails to comply with the erosion and sediment control plan as approved. Plans for grading, stripping, excavating, and filling work bearing the stamp of approval of the AEA shall be maintained at the site during the progress of the work. In order to obtain inspections, the permitee shall notify the AEA at least two (2) working days before the following: (1) Start of construction; (2) Erosion and sediment control measures are in place and stabilized; (3) Site clearing has been completed; (4) Rough grading has been completed; (5) Final grading has been completed; (6) Close of the construction season; and (7) Final landscaping. The permitee or his/her agent shall make regular inspections of all control measures in accordance with the inspection schedule outlined on the approved erosion and sediment control plan(s). The purpose of such inspections will be to determine the overall effectiveness of the control plan, and the need for additional control measures. All inspections shall be documented in written form and submitted to the AEA at the time interval specified in the approved permit. The AEA or its designated agent shall enter the property of the applicant as deemed necessary to make regular inspections to ensure the validity of the reports filed. (c) As built plans. All applicants are required to submit actual "as built" plans for any stormwater management practices located on-site after final construction is completed. The plan must show the final design specifications for all stormwater management facilities and must be certified by a professional engineer licensed in the State of Mississippi. A final inspection by the AEA is required before the release of any performance securities can occur.
(Ord. of 12-6-05)
Ask a question about Southaven law
Corpus searches the Southaven sections it holds and shows the ones that match, with their citations. Free, no sign-in.