§ 21.56.050 — Application requirements for new Wireless Telecommunications Facilities that are not co-location facilities
Long Beach Municipal Code (Supp. No. 53, Update 1: codified through Ordinance No. ORD-26-0027, enacted October 13, 2026) · Long Beach Municipal Code § 21.56.050
Corpus is an independent public-information project, not the official City of Long Beach website. Stable reference: corpuslaw.us/code/af9d8590-3221-45be-b29d-05712591350c
21.56.050 - Application requirements for new Wireless Telecommunications Facilities that are not co-location facilities.
In addition to the requirements set forth in Section 21.21.201 of the Zoning Regulations and Chapter 21.25 (Specific Procedures) of the Zoning Regulations, applicants for new Wireless Telecommunications Facilities shall submit the following materials regarding the proposed Wireless Telecommunications Facility: A. Photo simulations. Photo simulations of the facility from reasonable line-of-sight locations from public roads or viewpoints; B. Maintenance plan. A maintenance plan detailing the type and frequency of required maintenance activities, including maintenance of landscaping and camouflaging, if applicable; C. Five year build-out plan. A description of the planned maximum five (5) year build-out of the site for the applicant's Wireless Telecommunications Facilities, including, to the extent possible, the full extent of Wireless Telecommunications Facility expansion associated with future co-location facilities by other wireless service providers. The applicant shall use best efforts to contact all other wireless service providers known to be operating in the City upon the date of application, to determine the demand for future co-locations at the proposed site, and, to the extent feasible, shall provide written evidence that these consultations have taken place, and a summary of the results, at the time of application. The City shall, within thirty (30) days of its receipt of an application, identify any known wireless service providers that the applicant has failed to contact and with whom the applicant must undertake their best efforts to fulfill the above consultation and documentation requirements. The location, footprint, maximum tower height, and general arrangement of future co-locations shall be identified by the five (5) year build-out plan. If future co-locations are not technically feasible, a written explanation shall be provided; D. Nearby facilities. Identification of existing Wireless Telecommunications Facilities within a one (1) mile radius of the proposed location of the new Wireless Telecommunications Facility, and an explanation of why co-location on these existing facilities, if any, is not feasible. This explanation shall include such technical information and other justifications as are necessary to document the reasons why co-location is not a viable option. The applicant shall provide a list of all existing structures considered as alternatives to the proposed location. The applicant shall also provide a written explanation for why the alternatives considered were either unacceptable or infeasible. If an existing Wireless Telecommunications Facility was listed among the alternatives, the applicant must specifically address why the modification of such Wireless Telecommunications Facility is not a viable option. The written explanation shall also state the radio frequency coverage and capacity needs and objectives of the applicant, and shall include maps of existing coverage and predicted new coverage with the proposed facility; E. Availability for co-location. A statement that the proposed Wireless Telecommunications Facility is available for co-location, or an explanation of why future co-location is not technically feasible; F. RF report. A radio frequency (RF) report describing the emissions of the proposed Wireless Telecommunications Facility. The report shall demonstrate that the emissions from the proposed equipment as well as the cumulative emissions from the facility will not exceed the limits established by the Federal Communications Commission (FCC); G. Alternative analysis. Applications for the establishment of new Wireless Telecommunications Facilities inside Residential (R) or Institutional (I) zoning districts, Residential/Institutional Planned Development (PD) Districts, and residential or institutional General Plan Land Use Districts (LUDs) shall be accompanied by a detailed alternatives analysis that demonstrates that there are no feasible alternative nonresidential, non-institutional sites or combination of nonresidential, non-institutional sites available to eliminate or substantially reduce significant gaps in the applicant service provider's coverage or network capacity; H. Height justification. An engineering certification providing technical data sufficient to justify the proposed height of any new monopole or roof/building-mounted site; I. Deposit. A cash or other sufficient deposit for a third party peer review as required by this Chapter.
(ORD-18-0012 § 1, 2018)
Ask a question about Long Beach law
Corpus searches the Long Beach sections it holds and shows the ones that match, with their citations. Free, no sign-in.
