For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 18.72.040 — PERMIT; FILING TIME; ISSUANCE CONDITIONS

City Code of Salt Lake City, Utah (2026 S-21: current through Ord. 49-26, passed September 15, 2026) · Salt Lake City Code § 18.72.040

Corpus is an independent public-information project, not the official City of Salt Lake City website. Stable reference: corpuslaw.us/code/afe05b8b-bb52-42c7-bb69-a2c924a4017d

18.72.040: PERMIT; FILING TIME; ISSUANCE CONDITIONS:

A. No person, firm or corporation shall move any building or structure, or any portion thereof, over, upon, along or across any street or highway within the city without first obtaining a permit from the city engineer so to do at least seventy two (72) hours in advance of the proposed moving date. B. No house mover's permit shall be granted by the city engineer except as follows: 1. A relocation permit must be issued for the building or structure. 2. A separate application upon a form furnished by the division of building and housing services must be filed, and a separate permit obtained for moving each separate building or structure or portion of a building or structure. C. Each application for a house mover's permit must show: 1. The kind of building or structure to be moved; 2. The street number and legal description of the property from which the building or structure is to be moved; 3. The street number and legal description of the property to which the building or structure is to be moved; 4. The proposed route over which the building or structure is to be moved, which must be approved by the city engineer; 5. The date when such building or structure is to be moved and the time within which the moving will be completed. (Prior code § 5-10-21)

Ask a question about Salt Lake City law

Corpus searches the Salt Lake City sections it holds and shows the ones that match, with their citations. Free, no sign-in.