For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 25-8-233 — BARTON SPRINGS ZONE OPERATING PERMIT

Austin City Code (Supp. No. 174: codified through Ordinance No. 20260521-050, effective June 1, 2026) · Austin City Code § 25-8-233

Corpus is an independent public-information project, not the official City of Austin website. Stable reference: corpuslaw.us/code/b0517e6a-ed50-4e58-bb03-9326a1a4e254

§ 25-8-233 - BARTON SPRINGS ZONE OPERATING PERMIT.

(A) In the Barton Springs Zone, the owner or operator of a commercial or multifamily development is required to obtain an annual operating permit for the required water quality controls. (B) To obtain an annual operating permit, an applicant must: (1) provide the director with: (a) a maintenance plan; and (b) the information necessary to verify that the water quality controls are in proper operating condition; and (2) pay the required, nonrefundable fee. (C) The director may verify that a water quality control is in proper operating condition by either inspecting the water quality control or accepting a report from a registered engineer. (D) The director shall issue an operating permit after determining that: (1) the applicant has complied with the requirements of Subsection (B); and (2) the water quality controls are in proper operating condition. (E) The director shall transfer an operating permit to a new owner or operator if, not later than 30 days after a change in ownership or operation, the new owner or operator: (1) signs the operating permit; (2) accepts responsibility for the water quality controls; and (3) documents the transfer on a form provided by the director.

Source: Subsections 13-7-11(b), (c), and (d); Ord. 990225-70; Ord. 010329-18; Ord. 031211-11; Ord. 20131017-046; Ord. No. 20221027-045, Pt. 21, 11-7-22.

Ask a question about Austin law

Corpus searches the Austin sections it holds and shows the ones that match, with their citations. Free, no sign-in.