Sec. 30-109. - Placing of concrete.

(a) No pouring of concrete on any street shall begin without notifying the public works department at least twelve (12) hours prior to beginning operations. If the department of planning and development and in matters of construction of public projects contracted with or performed by public works, the public works department does not inspect the base within the twelve-hour period, the base shall be deemed approved. Concrete shall not be placed until the subgrade has been checked and accepted by the engineer. All forms shall be set and securely staked to the lines and grades established by the owner's engineer. The concrete shall be deposited on a thoroughly wetted subgrade in such a manner as to minimize rehandling, and shall be deposited in one (1) course. Spading or vibrating shall be required adjacent to all forms and joints. Placing shall be a continuous operation without bulkheads as nearly as is practical. Concreting operations will not be permitted when a descending air temperature falls below forty (40) degrees Fahrenheit, nor resumed until an ascending air temperature reaches thirty-five (35) degrees Fahrenheit. The city will not accept any pavement which has been damaged by frost. Under no circumstances shall the placing of concrete on a frozen subgrade be permitted. (b) Screeding, spreading, and finishing machines shall be preferred. If the scope of the work does not permit the use of this machine, the following procedure shall be followed. After the concrete has been deposited, it shall be approximately levelled and struck off to such depth below the finish grade as required to place reinforcing mats or wire mesh, and shall be properly consolidated prior to placing the reinforcing mats or mesh, when applicable, as the case may be. Additional concrete shall be deposited and struck off to a depth above the finish grade when properly consolidated, the surface shall conform to the line and grade desired. The strike-off board shall be straight, free from warp, and shod on the striking surface with a steel strip, and shall be shaped to the required curvature and crown. The strike-off board shall be moved forward with a combined longitudinal and transverse motion and without raising either end above the side forms during the strike-off process. A slight excess of material must be kept in front of the cutting edge at all times. The entire area of the pavement shall be tamped in such a manner as to secure maximum compaction and to reduce voids to a minimum. (c) The cross-section of the integral curb shall conform to the city's standard, and the concrete mix used shall be the same as that used in the concrete pavement, and shall be poured as one-course construction, with special attention being given to spading and tamping, to ensure adequate compaction and surfaces free from honeycomb. All integral curb sections shall make allowance for driveway openings in accordance with city standards. The concrete for integral curb may be left high on the outside form by a notch in the screed, or it may be carried back from the paver after the pavement surface has been struck off. The integral curb shall be shaped by a "mule" or by a straight-edge guided by templets of proper shape, temporarily inserted in the concrete at regular intervals. Joint spacing shall be the same as required in the pavement. The final finish shall match the texture of the adjoining pavement. Designed low points and flat grades shall be checked by pouring a small amount of water into the gutter at some distance from the inlet before the final finishing operations are completed. (d) Immediately following screeding and compaction operations, the slab surface shall be tested for trueness with a straight-edge. Any depressions found shall be filled with freshly mixed concrete, struck off, consolidated, and refinished. Longitudinal floating shall be done in conjunction with checking with the straight-edge. The float shall not be less than twelve (12) inches in length, and from eight (8) inches to ten (10) inches in width and shall be properly stiffened to prevent flexibility and warping. The straight-edge testing and floating operation shall continue until the entire surface is found to be free from observable departures from the straight-edge, and until the surface of the slab has the required grade and contour. (e) The pavement shall be finished by two (2) applications of a soft, flexible belt of approved composition, from eight (8) inches to twelve (12) inches in width. The belt shall be moved forward with a combined transverse and longitudinal motion, the longitudinal advances being very slight for the first belting, but with a sweeping motion for the final belting. Care should be exercised that the belting operation does not work the crown out of the pavement. Prior to the concrete attaining its initial set, the surface shall be given a final belting to produce a uniform surface of roughened texture. Excess water, laitance, or foreign matter brought to the surface during the course of the finishing operation shall be removed immediately by means of a squeegee drawn from the center of the slab toward either edge. Brooming may be required by the owner's engineer to provide a surface of roughened texture if the final belting does not accomplish the result required. Forms shall not be removed for at least twelve (12) hours after placing of concrete. All holes, voids, or honeycomb shall be moistened and filled with 1:2 mortar, and floated smooth. (f) After the concrete has hardened, the surface of the pavement shall be tested with a ten-foot straight-edge as previously described. Ordinates measured from the face of the straight-edge to the surface of the pavement shall not exceed one-sixteenth inch per foot from the nearer point of contact, and the maximum variation in ten (10) feet shall not exceed one-fourth inch. The contractor shall be required to remedy any deviation in excess of the above tolerance as directed by the owner's engineer.

(Code 1961, § 36-14(B)(4); Ord. No. 17,697, § 2a, 3-17-98; Ord. No. 21,867, § 1, 5-19-20)