For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15.01.045 — Moved buildings

Henderson Municipal Code (Supp. No. 59: codified through Ordinance No. 4163, adopted June 16, 2026) · Henderson Municipal Code § 15.01.045

Corpus is an independent public-information project, not the official City of Henderson website. Stable reference: corpuslaw.us/code/b07617d8-948b-41a1-9a66-fb77d15e05b2

15.01.045 - Moved buildings.

Buildings or structures moved into or within the City of Henderson shall comply with the provisions of this chapter, the technical codes and title 19 of the Henderson Municipal Code for new buildings and structures. All required permits shall be obtained prior to the demolition or removal or relocation of a building or structure to a new site. A. Requirements for site demolition. The owner is responsible to properly disconnect all utility services from the site of a moved building and remove all debris, building materials, foundations, and accessory building components from the site on which the building existed. The sewer lateral serving the premises shall be removed or shall be capped as determined by the Henderson utilities services department. For this work, the owner shall obtain a demolition permit in accordance with this chapter. B. Permit requirements for moved or relocated building. Application to move or relocate a building or structure shall be accompanied by: 1. The legal description of the property on which the building or structure is currently located; 2. The legal description of the property on which the moved or relocated structure is to be placed; 3. A fully dimensioned plot plan showing the size of the parcel on which the moved or relocated building is to be placed, any existing buildings on that parcel, and the distance from the moved or relocated building to existing buildings and all property lines; 4. Plans and calculations as determined by the building official to be sufficient to show that the moved or relocated building or structure will comply with all current technical codes and other applicable provisions of the Henderson Municipal Code; 5. Plans detailing any structural or architectural changes to be made to the interior or exterior of the moved or relocated building or structure; 6. A performance bond of cash or surety in favor of the city in an amount as determined by the building official sufficient to cause the removal of the moved building and all improvements should the project be abandoned; 7. And a letter of intent for completion, including a completion schedule, signed by the owner. If the owner fails to complete the project as detailed in the completion letter, which, for the purposes of this section, is deemed to be a maximum of 180 days, the owner may request a single 180-day extension from the building official by showing cause of extreme hardship. Should the owner fail to complete the project after expiration of the time specified in the intent for completion letter and any granted extension, the building official shall initiate action to cause the performance bond of cash or surety to be utilized to demolish or remove the moved or relocated building or structure and all site improvements as may be deemed appropriate by the building official. C. Permit requirements for new site. At the new site for a moved building, all work including construction of the foundation, installation of site utilities, site development and additions, alterations or repairs made to the moved building or structure shall require a permit application, construction document approval and permit issuance pursuant to the requirements of this chapter. Such work shall be inspected and shall obtain all required approvals prior to use or occupancy of the building or structure in accordance with this chapter and the technical codes.

(Ord. 2736, § 1 (part), 2008)

Ask a question about Henderson law

Corpus searches the Henderson sections it holds and shows the ones that match, with their citations. Free, no sign-in.