For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 18.05.050 — Design professional in responsible charge

Long Beach Municipal Code (Supp. No. 53, Update 1: codified through Ordinance No. ORD-26-0027, enacted October 13, 2026) · Long Beach Municipal Code § 18.05.050

Corpus is an independent public-information project, not the official City of Long Beach website. Stable reference: corpuslaw.us/code/b1595254-1028-4e36-baf4-599b307bfef1

18.05.050 - Design professional in responsible charge.

A. General. When it is required that documents be prepared by a registered design professional licensed in the State of California, the Building Official shall be authorized to require the owner to engage and designate on the permit application a registered design professional who shall act as the registered design professional in responsible charge. If the circumstances require, the owner may designate a substitute registered design professional in responsible charge who shall perform the duties required of the original registered design professional in responsible charge. The Building Official shall be notified in writing by the owner if the registered design professional in responsible charge is changed or is unable to continue to perform the duties. The registered design professional in responsible charge shall be responsible for reviewing and coordinating submittal documents prepared by others, including phased and deferred submittal items, for compatibility with the design of the building. B. Deferred submittals. 1. For the purposes of this section, deferred submittals are defined as those portions of the design which are not submitted at the time of the application and which are to be submitted to the Building Official within a specified period. 2. Deferral of any submittal items shall have prior approval of the Building Official. The registered design professional in responsible charge shall list the deferred submittals on the construction documents for review by the Building Official. 3. Documents for deferred submittal items shall be submitted to the registered design professional in responsible charge who shall review them and forward them to the Building Official with a notation indicating that the deferred submittal documents have been reviewed and been found to be in general conformance with the design of the building. The deferred submittal items shall not be installed until the Building Official has approved the deferred submittal documents. C. Structural observation. Where structural observation is required by Chapter 17 of the California Building Code adopted in Chapter 18.40, the statement of special inspections shall name the individual or firms who are to perform structural observation and describe the stages of construction at which structural observation is to occur.

(ORD-25-0019 § 1(Exh. A), 2025; ORD-22-0033 § 1(Exh. A), 2022; ORD-19-0031 § 1(Exh. A), 2019; ORD-16-0026 § 1(Exh. A), 2016)

Ask a question about Long Beach law

Corpus searches the Long Beach sections it holds and shows the ones that match, with their citations. Free, no sign-in.