For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 37-5 — Definitions

Scottsdale Revised Code (Supp. No. 80: codified through Ordinance No. 4681, adopted July 1, 2025) · Scottsdale Revised Code § 37-5

Corpus is an independent public-information project, not the official City of Scottsdale website. Stable reference: corpuslaw.us/code/b18f54e8-967a-4a6d-8572-345ebe68c366

Sec. 37-5. - Definitions.

Unless specifically defined below, words or phrases used in this article shall be interpreted so as to give them the meaning they have in common usage and to give this article its most reasonable application. A zone. See "Special flood hazard area". Accessory structure is a structure, smaller than five hundred (500) square feet, used solely for parking no more than two (2) cars and/or limited storage. Appeal means a request for a review of the floodplain administrator's interpretation of any provision of this article or a request for a variance. Area of shallow flooding means a designated AO or AH zone on the flood insurance rate map (FIRM) with a one (1) percent or greater annual chance of flooding to an average depth of one (1) to four (4) feet where a clearly defined channel does not exist, where the path of flooding is unpredictable and where velocity flow may be evident. Such flooding is characterized by ponding or sheet flow. Area of special flood hazard means the land in the floodplain within a community subject to a one (1) percent or greater chance of flooding in any given year. These areas are designated as Zone A, AE, AO, AH, and A1—30 on the FIRM and other areas determined by the criteria adopted by the Director of the Arizona Department of Water Resources. See "Special flood hazard area." Base flood is the flood having a one (1) percent chance of being equaled or exceeded in any given year. This is also called a one hundred-year flood. Base flood depth (BFD) is the depth shown on the Flood Insurance Rate Map for Flood Hazard Zone AO that indicates the water depth resulting from a base flood. Base flood elevation (BFE) is the elevation shown on the Flood Insurance Rate Map for Zones AE, AH and A1—30 that indicates the water surface elevation resulting from a flood that has a one (1) percent or greater chance of being equaled or exceeded in any given year. Basement is any area of the building having its floor sub-grade - i.e., below ground level - on all sides. Building. See "Structure." Building permit is the city's written authorization for a person to start development. Building permit, for this chapter only, includes permits for using the right-of-way, and excludes mining and drilling permits. Mining and drilling permits are issued by the appropriate county, state and federal authorities. Community means the City of Scottsdale. Compensatory storage means floodwater storage, or other mitigation, provided to compensate for an equal volume of storage lost in a special flood hazard area or local floodplain through fill or other development. Development is any human-caused change to improved or unimproved real estate, including, but not limited to, buildings or other structures, construction, mining, dredging, filling, grading, paving, excavation, or storage of equipment or materials. Encroachment is the advance or infringement of uses, plant growth, fill, excavation, buildings, permanent structures or development into a floodplain, which may impede or alter the flow capacity of a floodplain. Flood or flooding means a general and temporary condition of partial or complete inundation of normally dry land areas from: (1) The overflow of floodwaters; (2) The unusual and rapid accumulation or runoff of surface waters from any source, and/or; (3) The collapse or subsidence of land along the shore of a lake or other body of water as a result of erosion or undermining caused by waves or currents of water exceeding anticipated cyclical levels or suddenly caused by an unusually high water level in a natural body of water, accompanied by a severe storm, or by an unanticipated force of nature, such as flash flood, or by some similarly unusual and unforeseeable event. Flood Insurance Rate Map (FIRM) is the official map on which the Federal Emergency Management Agency (FEMA) or Federal Insurance Administration (FIA) has delineated both the areas of special flood hazards and the risk premium zones applicable to the community. Flood Hazard Zones A, AE, AO, AH, A1—30 and A99 are the areas shown on a FIRM which the Federal Emergency Management Agency has determined will be inundated during a base flood. These areas are called, collectively, "special flood hazard areas." Flood Hazard Zone D is an area shown on a FIRM which has undetermined but possible flooding hazards. Flood Hazard Zone E is an area of special flood-related erosion hazards. Flood Insurance Study (FIS) is the official report provided by the Federal Emergency Management Agency that includes flood profiles, Flood Insurance Rate Maps, and the water surface elevation of the base flood. Floodplain Administrator is the city manager or designee who is authorized by this chapter to administer its provisions. Floodplain or flood-prone area means any land area susceptible to being inundated by water from any source (see definition of "flooding"). Floodplain Board is the City Council of the City at such times as they are engaged in administering and enforcing this article. Floodplain management is an overall program of corrective and preventive measures for reducing flood damage, including but not limited to emergency preparedness plans, flood control works and floodplain management regulations. Floodplain management regulations are this chapter and other zoning ordinances, subdivision regulations, building codes, health regulations, special purpose ordinances (such as grading and erosion control) and other application of police power which control development in flood-prone areas. This term describes federal, state or local regulations in any combination thereof, which provide standards for preventing and reducing flood loss and damage. Floodproofing is any combination of structural and nonstructural additions, changes, or adjustments to structures, which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures, and their contents. Flood-related erosion is the collapse or subsidence of land along the shore of a lake or other body of water as a result of undermining caused by waves or currents of water exceeding anticipated cyclical levels or suddenly caused by an unusually high water level in a natural body of water, accompanied by a severe storm, or by an unanticipated force of nature, such as a flash flood or an abnormal tidal surge, or by some similarly unusual and unforeseeable event which results in flooding. Floodway is the area of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height. Also referred to as "Regulatory Floodway." Functionally dependent use is a use which cannot perform its intended purpose unless it is located or carried out in close proximity to water. The term includes only docking facilities, port facilities that are necessary for the loading and unloading of cargo or passengers, and ship building and ship repair facilities, and does not include long-term storage or related manufacturing facilities. Governing body means the local governing unit, i.e. county or municipality, that is empowered to adopt and implement regulations to provide for the public health, safety and general welfare of its citizenry. Grading is any excavation or filling of land or combination thereof. Highest adjacent grade is the highest natural elevation of the ground surface prior to construction next to the proposed walls of a structure. Historic structure is any structure that is: (1) Listed individually in the National Register of Historic Places (a listing maintained by the Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register; (2) Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district; (3) Individually listed on a state inventory of historic places in states with historic preservation programs which have been approved by the Secretary of the Interior; or (4) Individually listed on a local inventory of historic places in communities with historic preservation programs that have been certified either: (a) By an approved state program as determined by the Secretary of the Interior; or (b) Directly by the Secretary of the Interior in states without approved programs. Lowest floor is the lowest floor of the lowest enclosed area (including basement). An unfinished or flood-resistant enclosure, usable solely for parking of vehicles, building access or storage in an area other than a basement area is not considered a building's lowest floor; provided that such enclosure is not built so as to render the structure in violation of the applicable non-elevation design requirements of this article. Manufactured home is a structure, transportable in one (1) or more sections, which is built on a permanent chassis and designed to be used with or without a permanent foundation when connected to the required utilities. The term "manufactured home" does not include a "recreational vehicle." Manufactured home park (subdivision) is a parcel or contiguous parcels of land divided into two (2) or more manufactured home lots for rent or sale. Market value. See FEMA Publication 213 and Section 37-15(c)(2)(A). Mean sea level is, for purposes of the National Flood Insurance Program, the National Geodetic Vertical Datum (NGVD) of 1929, North American Vertical Datum (NAVD) of 1988, or other datum, to which base flood elevations shown on a community's Flood Insurance Rate Map are referenced. New construction is, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after March 26, 1971, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after March 26, 1971, and includes any subsequent improvements to such structures. Obstruction is, including, but not limited to, any dam, wall, wharf, embankment, levee, dike, pile, abutment, protection, excavation, channelization, bridge, conduit, culvert, building, wire, fence, rock, gravel, refuse, fill, structure, vegetation or other material in, along, across or projecting into any watercourse which may alter, impede, retard or change the direction and/or velocity of the flow of water, or due to its location, its propensity to snare or collect debris carried by the flow of water, or its likelihood of being carried downstream. One hundred-year flood or 100-year flood is the flood having a one (1) percent chance of being equaled or exceeded in any given year. See "Base flood." Pending SFHA is an area having flood and/or flood-related erosion hazards as determined by a FIS for which the city has received notification from FEMA that the FIS represents the best available data as provided by FEMA's Floodplain Management Bulletin 1-98, but a FIRM revision is not complete. Person is an individual or the individual's agent, a firm, partnership, association or corporation, or an agent of the aforementioned groups, or this state or its agencies or political subdivisions. Recreational vehicle is a vehicle which is: (1) Built on a single chassis; (2) Four hundred (400) square feet or less when measured at the largest horizontal projection; (3) Designed to be self-propelled or permanently towable by a light-duty truck; and (4) Designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use. Regulatory flood depth (RFD) is one (1) foot above the base flood depth, or two (2) feet above the highest adjacent grade, if no depth number is shown on the FIRM. Regulatory Flood Elevation (RFE) is an elevation one (1) foot above the "base flood elevation" for a watercourse for which the base flood elevation has been determined and shall be determined by the criteria developed by the Director of the Arizona Department of Water Resources for all other watercourses. Regulatory floodway is the channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height. Residential structure is a place of residence and may be a single-family or multifamily dwelling. Riverine is relating to, formed by, or resembling a river (including tributaries), stream, brook, etc. Sheet flow area. See "Area of shallow flooding." Special Flood Hazard Area (SFHA) is an area in the floodplain subject to a one (1) percent or greater chance of flooding in any given year. It is shown on a Flood Insurance Rate Map as Zone A, AO, A1—A30, AE, A99 or AH. Start of construction is the date of building permit issuance for new construction and substantial improvements to existing structures, provided the actual start of construction, repair, reconstruction, rehabilitation, addition, placement or other improvement is within one hundred eighty (180) days after the date of issuance. The actual start of construction means the first placement of permanent construction of a building (including a manufactured home) on a site, such as the pouring of a slab or footings, installation of pilings or construction of columns. Permanent construction does not include land preparation (such as clearing, excavation, grading or filling), the installation of streets or walkways, excavation for a basement, footings, piers or foundations, the erection of temporary forms or the installation of accessory buildings such as garages or sheds not occupied as dwelling units or not part of the main building. For a substantial improvement, the actual "start of construction" means the first alteration of any wall, ceiling, floor or other structural part of a building, whether or not that alteration affects the external dimensions of the building. Structure is a walled and roofed building that is principally above the ground; this includes a gas or liquid storage tank or a manufactured home. Substantial damage is damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged condition would equal or exceed fifty (50) percent of the market value of the structure before the damage occurred. Substantial improvement is any reconstruction, rehabilitation, addition, or other improvement of a structure, the cost of which equals or exceeds fifty (50) percent of the market value of the structure before the "start of construction" of the improvement. This term includes structures which have incurred "substantial damage", regardless of the actual repair work performed. The term "substantial improvement" does not, however, include: (1) Any project for improvement of a structure to correct existing violations of state or local health, sanitary, building, or safety code specifications which have been identified by the local code enforcement official and which are the minimum necessary to assure safe living conditions, or (2) Any alteration of a "historic structure," provided that the alteration will not preclude the structure's continued designation as a "historic structure". Variance is a grant of relief from some of the requirements of this article which permits construction in a manner that would otherwise be prohibited by this article. Water surface elevation is the height, in relation to the National Geodetic Vertical Datum (NGVD) of 1929, North American Vertical Datum (NAVD) of 1988, or other datum, of floods of various magnitudes and frequencies in the floodplains of coastal or riverine areas. Watercourse means a natural or human-caused lake, river, creek, stream, wash, arroyo, channel, culvert, pipes or any other topographic feature, through, on or over which waters flow or pond at least periodically. Watercourses include specifically designated areas in which substantial flood damage may occur.

(Code 1972, § 5-612; Ord. No. 1993, 2-29-88; Ord. No. 3333, § 3, 9-5-00; Ord. No. 4000, § 1(Res. No. 8962, Exh. A, § 5), 8-27-12; Ord. No. 4246, § 1(Res. No. 10402, § 1, Exh. A), 7-6-16)

Ask a question about Scottsdale law

Corpus searches the Scottsdale sections it holds and shows the ones that match, with their citations. Free, no sign-in.