Sec. 31-6. - IBC SECTION 107 CONSTRUCTION DOCUMENTS - amendments.

Only the following portions of SECTION 107, CONSTRUCTION DOCUMENTS, are amended: (a) Section 107.2, Construction documents, is amended to read as follows: 107.2 Construction documents. Construction documents shall be in accordance with Sections 107.2.1 through 107.2.11. (b) Sections 107.2.1.1 and 107.2.1.2 are added to read as follows: 107.2.1.1 Cover sheet. On the cover sheet or site plan, building code data (separate from planning, zoning and other non-building code data) shall include: 1. City construction codes and edition dates; 2. Number of buildings for this project and construction of any fire walls; 3. Occupancy groups, mixed occupancies or non-separated occupancies; 4. Type of construction; 5. Actual floor area and allowable floor area of each story; 6. Actual and proposed height and number of stories and allowable height and number of stories; 7. Fire sprinkler classifications; 8. Scope of work; 9. Occupant load(s) of rooms and number of exits per tenant and per story; 10. Live loads for each floor or portion thereof of a nonresidential building that is or has been designed to exceed 50psf (2.40kN/m2); 11. Information on any modifications approved for the building(s); 12. Any special occupancies listed in IBC Chapter 4; and 13. Any buildings classified by IBC Section 510, Special Provisions. 107.2.1.2 Included plans. Construction documents shall include: 1. Supporting data, calculations, dimensioned site plans indicating required yards, imaginary and actual property lines. 2. Plans indicating how required structural and fire-resistive integrity will be maintained where penetrations are made for electrical, mechanical, plumbing and communication conduits, pipes and similar systems. 3. An egress plan showing the length of common path of travel from the most remote point in the rooms, proposed exit paths, travel dimensions, exit access travel distances, and accessible egress. 4. A fully dimensioned architectural site plan showing accessible routes from accessible parking spaces and passenger loading zones to the entrances and exits of the building(s), including slopes at grade along the accessible routes (i.e. 1:50, 1:20, 1:12). 5. Where non-separated occupancies are applied, an analysis for the entire building shall be provided to demonstrate compliance with Section 508.3. 6. For plans related to detached dwellings, identify braced wall lines and show all pertinent information including: bracing methods, location and length of braced wall panels, foundation requirements, and design details at top and bottom of braced wall panels. (c) Section 107.2.2, Fire protection system shop drawings, is amended to read as follows: 107.2.2 Fire protection system shop drawings. The provisions of the Fire Code as adopted and amended in the Scottsdale Revised Code, Chapter 36, shall apply. (d) Section 107.2.6.1, Design flood elevations, is amended to read as follows: 107.2.6.1 Design flood elevations. Where design flood elevations are not specified, they shall be established in accordance with Section 1612.3.1. For buildings and structures located in flood hazard areas, construction documents shall include: 1. Delineation of flood hazard areas, floodway boundaries and flood zones. 2. Design flood elevation. 3. In Special Flood Hazard Areas, the elevation of the lowest floor, including basement, above the highest adjacent grade; in other areas, elevation of the lowest floor, including basement. 4. If design flood elevations are not included on the city's Flood Insurance Rate Map (FIRM), the building official may approve design flood elevations and floodway data from other sources. 5. Building plans for construction required to meet the flood plain requirements. (e) Sections 107.2.9 and 107.2.10 are added to read as follows: 107.2.9 Energy information. The construction documents shall include the information specified in IECC Section C103.2 and a commissioning plan in accordance with IECC Section C408.2.1. 107.2.10 Standard plans. An applicant may submit a standard plan, which is a single-family residential construction plan used two or more times, with optional features. If approved, only modifications not shown on the standard plan must be submitted for review. All modifications shall be clearly identified by clouded symbols, deltas, or other appropriate means. The review fee for modifications only, will be hourly in accordance with city fee schedule. If, in building official's judgment, the modifications are excessive or inadequately defined, the full plan review fee will be charged. (f) Section 107.3.1, Approval of construction documents, is amended to read as follows: 107.3.1 Approval of construction documents. When the building official issues a permit, the construction documents shall be approved, in writing or by stamp. One set of construction documents shall be retained by the building official. The other set shall be returned to the applicant, and together with manufacturer's installation instructions, shall be kept at the site of work and shall be open to inspection by the building official.

(Ord. No. 4550, § 1(Res. No. 12498, § 1(Exh. A)), 9-20-22, eff. 1-1-23)