§ 10.105 — STREET TREE REPLACEMENT FUND
Madison General Ordinances (Rev. 28, Update 3: codified through ORD-26-00040, published August 3, 2026) · Madison General Ordinances § 10.105
Corpus is an independent public-information project, not the official City of Madison website. Stable reference: corpuslaw.us/code/b2f2537f-d125-4530-bc73-3387372a58fc
10.105 - STREET TREE REPLACEMENT FUND.
(1) Purpose. Over the last several decades, the City has invested in growing, sustaining and protecting its urban forest, including street trees located in the median or terrace areas of the City's rights-of-way. These street trees provide substantial benefits to the City, its residents, visitors, and property owners, in addition to providing long-lasting environment benefits. Street trees support both individual and community goals for healthy, safe and prosperous communities. Indeed, a healthy, vibrant, diverse, established and well managed urban forest is crucial for the health, safety and welfare of the public. It can take generations to develop a healthy urban forest, and generations to replace one. The City's historical and ongoing commitment to its urban forest has led it to be recognized by the Arbor Day Foundation as a Tree City USA community since 1989. However, in addition to being subject to disease and infestations like other trees, street trees face numerous other unique challenges due to their location, including threats posed by passing vehicles, soil quality, space availability, impacts from construction activities, and conflicts with other right-of-way users (including utilities) and adjoining property uses. A fully mature street tree, if removed before the end of its natural life, may take several decades to be replaced, although, in reality, many such trees can never actually be fully replaced. The purpose of this ordinance is to establish a mechanism whereby the City and the public will be made whole for the removal of a street tree. (2) Definitions. For the purposes of this section, the following definitions apply: Aggregate Diameter means the combined diameter of a Multiple Stemmed Tree of each stem that has a diameter of six inches or greater when measured at breast height as follows: For Multiple Stemmed Trees where the trunk separations begin at lower than four and one-half feet from the ground, but higher than one foot from the ground, measurement shall be taken one foot below the separation. For Multiple Stemmed Trees where the trunk separations begin below one foot from the ground, the measurement shall be taken at four and one-half feet above the average ground level at the base of the tree. Caliper means the diameter of a tree as measured at a point six inches above the existing grade at the base of the tree. This point of measurement is used only for measuring nursery stock and replacement trees. DBH or Diameter at Breast Height means the diameter of the trunk of the tree measured in inches at a point four and one-half feet above the existing grade at the base of the tree or the Aggregate Diameter of a Multiple Stemmed Tree, rounded down to the nearest inch. This point of measurement is used for measuring mature and established trees. Multiple Stemmed Tree means a single tree made up of two or more main stems originated below the height used for measuring DBH. Person has the same meaning as in Sec. 10.05(1)(b), except that it does not include the City, its employees, agents, contractors and subcontractors when acting in their official capacity on behalf of the City. Reestablishment Cost means the costs incurred to prepare a site suitable for the City to plant a replacement tree, including stump removal, soil replacement, and planting box construction. Replacement Cost means the cost to the City to replace a lost tree, including purchasing of a tree, planting costs, and initial care and maintenance. Street Tree is a tree within City controlled right-of-way, including within terrace areas, medians, and undeveloped right-of-way. Trees do not include shrubs and bushes. (3) Street Tree Replacement Fund. There is hereby established a Street Tree Replacement Fund, which fund shall only be used to directly support the planting, establishment, or protection of street trees. These funds may only be used by the Streets or Engineering Divisions, with the approval of the City Forester, to purchase and plant trees, replace soil, install planting boxes, protect existing street trees, or take other actions that directly support, protect, replace or enhance the City's street tree stock. (4) Requirement. Any person who removes, or causes the removal of a street tree shall either replace the tree as provided by an approved Tree Replacement Plan under Sec. 10.101, or reimburse the City for the value of the removed tree by paying into the Street Tree Replacement Fund. The value of the removed tree shall be established under Sub. (5). (5) Valuation. The City Forester shall determine the value of the removed street tree by applying the City Forester's Street Tree Valuation Policy, which policy shall be created by the City Forester and approved by the Board of Public Works. The Policy shall be updated at least bi-annually so that the valuations reflect the City's updated costs. In establishing the policy, the City Forester shall consider a tree's replacement cost (the costs that will be incurred by the City to purchase suitable replacement(s) for the tree), and reestablishment costs (the costs that will be incurred by the City to prepare a site suitable for sufficient canopy growth to replace the lost tree). Other factors to consider will include, but not be limited to, size, age, species, and character of the tree, type of street, soil condition, and the existing tree canopy. The value determination for a tree is meant to reflect the City's actual costs that would be incurred to replace the removed tree. (6) Notice. Once the valuation for a tree is determined under Sub. (5), the City Forester shall provide notice to the person of such value and the requirement to make payment to the Street Tree Replacement Fund within thirty (30) days. Notice may be provided in person, or be sent by first class mail or electronic communications. If notice is sent, it is considered complete upon mailing. (7) Appeals. Any person aggrieved by the City Forester's valuation determination under Sub. (5) may appeal the City Forester's determination to the Streets Superintendent by filing a notice of appeal with the City Forester within ten (10) days of the notice under Sub. (6), stating the grounds therefore. The Streets Superintendent may, after hearing from the City Forester and the appellant, affirm or modify, in whole or in part, the valuation determination of the City Forester. The decision of the Street Superintendent may be appealed to the Board of Public Works by filing a notice of appeal with the City Engineer within ten (10) days of the Street Superintendent's determination, stating the grounds therefore. The Board of Public Works shall fix a reasonable time for the hearing on the appeal and give due notice to the parties in interest, and decide the same within a reasonable amount of time. During the hearing, any party may appear in person or by an agent or attorney. The Board of Public Works may, in conformity with this ordinance, affirm or modify, wholly or partially, the valuation determination. The Board's decision shall be a final administrative determination, subject to judicial review as may be provided by law. (8) Penalty. (a) Any person who fails to make payment to the City as required under Sub. (4) within thirty (30) days from the notice provided under Sub. (6) or the expiration of any appeals under Sub. (7), whichever is later, shall, upon conviction, pay a forfeiture of not less than twenty-five dollars ($25) nor more than five hundred dollars ($500). Each day during which any violation of the provisions of this section shall occur or continue shall constitute a separate offense. (b) Special Charge. In addition to the penalties provided for under Subd. (a), if payment to the City as required under Sub. (4) is not made, and if the City proceeds to replace the removed tree, the City shall recover the actual costs of the tree replacement incurred by the City, up to the tree valuation as determined under Sub. (5), by imposing a special charge for current services against the property served.
(Cr. by ORD-25-00071, 10-16-25)
Ask a question about Madison law
Corpus searches the Madison sections it holds and shows the ones that match, with their citations. Free, no sign-in.
