Implementation.
R.I. Gen. Laws § 45-61.2-2
in effect45-61.2-2. Implementation.
(a) The department of environmental management (DEM), in conjunction with the coastal
resources management council (CRMC) shall, by July 1, 2008, amend the Rhode Island
stormwater design and installation standards manual. The changes shall include, but
not be limited to, incorporation into existing regulatory programs that already include
the review of stormwater impacts the following requirements:
(1) Maintain pre-development groundwater recharge and infiltration on site to the maximum
extent practicable;
(2) Demonstrate that post-construction stormwater runoff is controlled, and that post-development
peak discharge rates do not exceed pre-development peak discharge rates; and
(3) Use low impact-design techniques as the primary method of stormwater control to the
maximum extent practicable.
(b) City and town ordinances and regulations may require compliance with the Rhode Island
stormwater design and installation standards manual, as amended, for any development,
redevelopment, or land disturbance.
P.L. 2007, ch. 133, § 1; P.L. 2007, ch. 203, § 1; P.L. 2009, ch. 310, § 69; P.L. 2012,
ch. 219, § 1; P.L. 2012, ch. 228, § 1.
Source: State of Rhode Island General Assembly (rilegislature.gov)URL: https://webserver.rilegislature.gov/Statutes/TITLE45/45-61.2/45-61.2-2.htmFetched: 10/20/2026
