For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5.9.21 — Mineral Extraction

Code of the City of Grand Rapids, Michigan (Supp. No. 70: codified through Ordinance No. 2026-08, enacted April 14, 2026) · Grand Rapids City Code § 5.9.21

Corpus is an independent public-information project, not the official City of Grand Rapids website. Stable reference: corpuslaw.us/code/b3e21c98-84d9-4296-a50b-c463fd57ac58

Sec. 5.9.21. - Mineral Extraction.

A. Exemptions. The following shall be exempt from the requirements of this Section: 1. The usual and customary balancing of land by cutting and filling on a site in preparation for an approved development project provided that the removal does not exceed two hundred (200) cubic yards. 2. Excavation associated with public streets, sewer or water lines, public utilities, and other similar uses. 3. Any mineral extraction operation that was in existence and otherwise lawfully operated prior to the effective date of this Chapter. B. Site Requirements. 1. Machinery, Building, Mining and Stockpile Setbacks. All machinery, equipment, buildings, structures and activities shall meet the following minimum setbacks. Where more than one (1) setback requirement in this subsection is applicable, the greater setback distance shall apply. a. Fifty (50) feet from any lot line; b. One hundred (100) feet from a Residential Zone District; and c. Three hundred (300) feet from any stream, water body or wetland. 2. Nuisance or Hazard. Any noise, odors, smoke, fumes, or dust generated on the site by any digging, excavating, loading or processing operation and borne, or apt to be borne by the wind, shall be confined to prevent a nuisance or hazard on adjacent properties or public streets. 3. Landscaping. Berms and landscaping shall be installed at all locations around the site that lack natural screening in accordance with the requirements of Section 5.11.12. 4. The following information shall be provided in addition to information required for a Special Land Use submittal. a. A tree inventory on a site map showing the location of all trees eighteen (18) inches in diameter or larger in the area(s) affected by mining shown by numbered dots, with an accompanying database table of corresponding species, caliper size listings, and condition. b. A site inventory that contains the identification of all water bodies, wetlands, woodlands, flora, floodplains, floodways, hydric soils, groundwater recharge areas, water table levels and flows, in addition to a written description of the quality, character, and health of the natural features. c. Division of the site into a series of cells that illustrate the sequence of the proposed extraction activities and estimated dates for activities. d. Reclamation Plan as described in C, below. e. Supporting Documentation as described in D, below. C. Required Reclamation Plan. A plan shall be submitted showing how the entire property shall be returned to a developable site for uses that are permitted in the Zone District. The reclamation plan shall include the following: 1. Grading information showing proposed topography at contour intervals of not less than two (2) feet. 2. Schedule of progressive rehabilitation and the proposed date for completing all extraction operations and handling of all spoils and extraneous materials. 3. Concept plan(s) for the proposed end use of the site when restored, drawn to scale, and prepared by a professional engineer, licensed architect, or licensed landscape architect. The concept plan shall include: a. The proposed circulation system, including the location of internal roads and connection to the external road network; b. Delineation of drainage patterns, identification of lakes, floodplains, water bodies, wetlands; and c. Lot layout and other development information. D. Supporting Documentation. 1. Haul Route Map. An area map delineating the haul route to be used for the proposed operation shall be submitted. Haul routes shall not pass through residential areas, except on Regional or Major Streets, and shall be approved by the City's Traffic Engineering Department. 2. Noise Control Plan. A study and report prepared by a qualified professional which estimates the noise levels at the lot lines containing the extraction operation and at successive stages of the operation shall be submitted. This plan shall contain mitigation measures to be implemented when noise levels exceed acceptable standards. 3. Soil Erosion Plan. A dust and mud control plan shall be included as part of the submittal to the City's Environmental Protection Services Department. 4. Impact Mitigation Plan. A plan to mitigate effects resulting from mineral extraction, and the method by which complaints about any aspect of the facility operation or off-site transportation are to be received and resolved shall be submitted. This plan shall set forth the procedures to address complaints regarding adverse effects, such as noise, fugitive dust, ground water changes, wetland loss or other potential effects. E. Operation Requirements. 1. Hours of Operation. The Planning Commission shall set the appropriate days and times for extraction and transportation operations based on the potential effects on surrounding properties, traffic conditions on affected roadways, and other similar factors. 2. Hazardous Materials. All fuels, chemicals and other hazardous materials to be located on-site shall be noted in the application, including material, quantity, use, and method of primary and secondary containment. 3. Equipment Storage. Only equipment or vehicles owned or leased by the operator shall be stored on the site overnight. 4. Ingress and Egress Roads. Entrance roads used from any adjacent street shall be hard surfaced with a concrete or bituminous substance for at least one hundred fifty (150) feet from the entrance to the site. 5. Outside Materials. No material from outside the site shall be brought in for processing or storage. 6. Reclamation. a. After mining is completed on one specified area, quadrant, or cell, reclamation shall follow progressively in reasonable stages set forth in the plan before mining continues on other areas of the site. Extraction areas which are inactive or expected to be inactive for over one (1) year shall be stabilized and slopes reduced to one (1) vertical foot to four (4) horizontal feet. b. All rehabilitation activity shall be in compliance with soil erosion and sedimentation requirements of the City, as well as state and federal governments. Ground cover and other plantings to stabilize the soil surface and to beautify the restored area, as well as to protect from erosion and siltation, shall be provided. All seeding and planting materials shall be of native stock or plantings approved by the Director. c. Reclamation of the entire site shall be completed within nine (9) months of cessation of all mining operations. All plant structures, buildings, stockpiles and equipment shall be removed within the time limit; provided, however, that structures that have a function under the reclamation plan and can be lawfully used under the requirements of the Zone District may be retained.

Ask a question about Grand Rapids law

Corpus searches the Grand Rapids sections it holds and shows the ones that match, with their citations. Free, no sign-in.