For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 33.420.041 — When Design Review or Meeting Design Standards is Required

Portland City Code (non-zoning titles; Title 33 separately); partial · Portland Zoning Code § 33.420.041

Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/b4103391-01ee-4f80-82fe-58f880c51b93

33.420.041 When Design Review or Meeting Design Standards is Required

Unless exempted by Section 33.420.045, Items Exempt From This Chapter, the following must meet the design standards or be approved through design review: A. New development; B. Exterior alterations to existing development; C. Nonstandard improvements in the public right-of-way such as street lights, street furniture, planters, public art, sidewalk and street paving materials, landscaping, and new bridges. Nonstandard improvements in the public right-of-way must receive approval from the City Engineer prior to applying for design review. Improvements that meet the City Engineer’s standards are exempt from this chapter; D. Items identified in the Citywide Policy on Encroachments in the Public Right-of-Way or Title 17, Public Improvements, as requiring design review; E. Removal of trees 6 or more inches in diameter in the South Auditorium plan district; F. Where City Council requires design review of a proposal because it is considered to have major design significance to the City. In these instances, the City Council will provide design guidelines by which the proposal will be reviewed, and specify the review procedure; and G. Floating structures, except individual houseboats.

Ask a question about Portland law

Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.