Sec. 30-245. - Restoration.
(a) Restoration required. Any boring, excavation, or cut, made pursuant to the terms of this article shall be restored. Temporary restoration shall occur immediately upon completion of the work that required the boring, excavation or cut. Permanent restoration shall be completed by the applicant or, if agreed to in writing with the city manager, shall be completed by the city.
(b) Resurfacing. The applicant shall resurface the full width of any street lane and replace pavement markings in the public right-of-way where there has been an excavation or cut. If the city has scheduled a resurfacing project which includes the applicant's permitted area, the applicant and the city manager may contractually agree for the applicant to pay a proportionate share of the city's costs of resurfacing rather than requiring the applicant to resurface the area. Resurfacing shall not be required for minor maintenance.
(c) Temporary restoration.
(1) No materials removed from boring, excavation, or cut, shall be used as backfill material. This limitation applies to pieces of broken concrete or asphalt.
(2) The top six (6) inches of backfill material shall be compacted to ninety-five (95) percent of maximum density as determined by the modified Proctor compaction test.
(3) The surface course shall consist of a two inch application of cold mix asphalt for asphalt streets, concrete streets or streets with single or double penetration surface treatments. For gravel streets and alleys, the top six (6) inches of backfill material shall meet Class 7 of the most current Arkansas State Highway Commission Standard Specifications, and shall be compacted to conform to the surrounding surface.
(4) The applicant is permitted to use any or all of the following as backfill material:
a. Crushed rock and natural fines uniformly mixed and so proportioned as to meet the specifications for Class 7 as reflected in the most recent edition of the Arkansas State Highway Commission Standard Specifications;
b. Crushed rock, or other selected material approved by the city manager or his designee, that is free of debris and excess moisture, when compacted to a minimum of ninety (90) percent density as determined by the modified Proctor compaction test;
c. Compacted river sand or lean mix concrete if the use of this material has been previously approved by the city manager.
(5) The applicant is wholly responsible for making temporary restorations consistent with the standards set forth in this article. Any temporary restoration must be of sufficient quality, as determined by the city manager, to bring the city street, alley, or public property, back to its original usefulness and must be capable of supporting normal traffic use for a period of thirty (30) days.
(6) Inspections shall be made by the city of any temporary restoration. If the temporary restoration does not meet the standards of this article, then the permit holder shall be required to correct the situation within forty-eight (48) hours.
(7) Any temporary restoration shall be replaced by the applicant with the appropriate permanent restoration within thirty-five (35) days of the date of issuance of permit. Any temporary restorations remaining after that time shall be repaired by the city and the cost of such repair shall be paid by the permit holder or shall be claimed from the surety bond required pursuant to this article. The city manager shall grant an extension of the thirty-five (35) days if a delay is caused by inclement weather. In such case, the applicant will be responsible for temporary repairs until permanent restoration is in place.
(d) Permanent restoration.
(1) Unless otherwise agreed to in writing by the city manager and the applicant, the applicant shall make all permanent restorations of any street or alley pavement in which there has been a boring, excavation, or cut made pursuant to this article.
(2) Arterials and collectors. Permanent restoration of concrete or asphalt streets designated as arterials or collectors by the master street plan shall be as follows:
a. Except as set forth in this subsection, all backfill and compaction requirements shall comply with subsection 30-245(c) concerning temporary restorations; and
b. Backfill material shall be removed to a depth of eight (8) inches for concrete streets and ten (10) inches for asphalt streets. Further,
1. If the street is concrete, eight (8) inches of three thousand (3,000) pound per square inch P.C. concrete, meeting the specifications of the Arkansas Highway Department, shall be placed to provide the final restored surface;
2. If the street is asphalt, eight (8) inches of three thousand (3,000) psi P.C. concrete shall be placed to within two (2) inches of the street surface and, as soon as the concrete has cured, a bituminous tack coat shall be applied to the concrete and the sides of the cut, and then two (2) inches of hot mix asphaltic concrete, meeting Arkansas State Highway specifications, shall be applied.
(3) Streets and surfaces other than arterial and collector streets. The permanent restoration of surfaces other than those of arterial and collector streets shall be made as follows:
a. Except as set forth in this subsection, all backfill and compaction requirements shall comply with subsection 30-245(c) concerning temporary restorations;
b. If the surface is concrete, the top six (6) inches of backfill shall be removed and replaced with six (6) inches of three thousand (3,000) psi concrete, and then finished to conform with the surrounding surface;
c. If the surface is asphalt or single or double penetration surface treatment, the top eight (8) inches of backfill shall be removed and replaced with six (6) inches of hot binder asphaltic concrete in two (2) inch lifts, with the final two (2) inches consisting of asphaltic concrete surface course to conform with the surrounding surface;
d. If the surface is gravel, gravel shall be added as required and compacted to conform with the surrounding surface.
(e) Notice. Applicants authorized, or required, to make permanent restorations pursuant to this article shall notify the city manager on the first business day after the completion of the permanent restoration for each permit.
(f) Sidewalks, driveways or curbs. All removed or undercut sidewalks, driveways and curbs shall be restored by the permit holder in accordance with this article and any other applicable ordinance. The applicant shall be responsible for protecting any shoulders, ditches, and other drainage structures in the work area and, if damaged in any way whatsoever during the time of the permit, shall make all necessary repairs. Notification of completion shall be in compliance with the standards established by the city manager.
(g) Grasses and vegetation. To the extent possible, the applicant shall restore or replace all planted grasses and vegetation, including trees of the same height and character. The city manager shall permit modifications to this aspect of the restoration plan in appropriate cases. Notification of completion shall be in compliance with the standards established by the city manager.
(h) Excess material or debris. When any temporary or final restoration is completed, all excess material, debris, mud, or other foreign materials shall be removed from the street, alley, or other public property involved in the permit, and the surface shall, to the satisfaction of the city manager, be restored to its original condition.
(i) Agreements for final restoration not prohibited. Nothing in this article shall prohibit the city manager from entering into written agreements with any permit holder concerning the final restorations, provided that the terms of any such agreements shall comply with the requirements of this article or shall be determined by the city manager to utilize new procedures that comply with the purposes of this article, and, provided further, that the city shall receive a reasonable inspection fee for the final inspection of any work done pursuant to such an agreement.
(Ord. No. 17,512, § 5, 7-1-97)