§ 14-1302 — Commercial and residential building permit and inspection fees
Code of Ordinances, City of Corpus Christi, Texas (Supp. No. 44: codified through Ordinance No. 033940, enacted June 2, 2026) · Corpus Christi Code of Ordinances § 14-1302
Corpus is an independent public-information project, not the official City of Corpus Christi website. Stable reference: corpuslaw.us/code/b50908b8-ddf7-4339-9cc7-b6ca32ab507d
Sec. 14-1302. - Commercial and residential building permit and inspection fees.
(a) The building permit fees applicable to the issuance of a building permit for residential construction shall be based on the total square footage at a rate according to the fee schedule published in section 14-1313 rounded up to the nearest cent. (b) The standardized building valuation system to be used to compute commercial construction permit fees will consider the total value of all construction work, including plumbing, electrical, paving, parking, driveway approach, energy conservation, fuel gas, mechanical equipment, and other systems, including appurtenances and site improvements, materials, labor, contractor's profit and overhead. (1) The valuation of building, alteration, or structure used in computing commercial building permit fees will be based on, and at least equivalent to, the latest standardized building valuation data as published by the International Code Council Building Safety Journal, as adjusted by the latest regional construction cost adjustment factors published annually by Engineering News Record. The building official may alternatively accept a comparable valuation submitted by the applicant. The applicant's valuation shall be verified against the Elimination of Architectural Barriers Report, if one is required, and the higher of the two (2) valuations shall be used. In the event the Elimination of Architectural Barriers Report valuation is not available prior to issuance of the permit, the Elimination of Architectural Barriers Report valuation shall be confirmed prior to conducting the final inspection. If additional permit fees are required, the final inspection shall not be passed until all fees are paid. If no Elimination of Architectural Barriers Report is available, the building official may refer to the latest standardized building valuation data as published by the International Code Council Building Safety Journal, as adjusted by the latest regional construction cost adjustment factors published annually by Engineering News Record. (2) The applicant for a construction permit may appeal any determination of the building official to the construction trade advisory & appeals board. (3) Standardized building valuations required pursuant to subsection (b)(1) will be used as the basis for permitting of a commercial project. (4) Standardized building valuations required pursuant to subsection (b)(1) for pre-engineered metal building warehouses must be values derived pursuant to subsection (b)(1). (5) Standardized building valuations required pursuant to subsection (b)(1) will be derived from the latest data published by International Code Council Building Safety Journal and Engineering News Record and adjusted based on the regional multiplier published by the International Code Council. (6) The standardized building valuations referred to in subsection (b)(1) are adopted by reference and declared to be a part of this section. (7) If, in the opinion of the building official, or the building official's authorized representative, the valuation of a commercial building, alteration, structure, electrical, energy conservation, fuel gas, mechanical, or plumbing systems appears to be underestimated on the application, the permit may be denied, unless the applicant can show detailed estimates or appraisals that meet the approval of the building official. Alternatively, the building official may set the permit valuation pursuant to the standardized building valuation data adopted in subsection (b)(1), and issue the permit with a fee based on that valuation. Permit valuations must be based upon total construction cost, such as electrical, energy conservation, fuel gas, mechanical, plumbing equipment and other systems, including materials and labor, site improvements, contractor's profit and overhead. (c) When determining the value that is applied to the fee schedule, values are rounded up to the next higher one thousand dollar-valuation category.
(Ord. No. 028756, § 1, 8-31-2010; Ord. No. 031786, § 1, 6-11-2019; Ord. No. 032058, § 14, 3-17-2020)
Ask a question about Corpus Christi law
Corpus searches the Corpus Christi sections it holds and shows the ones that match, with their citations. Free, no sign-in.
