§ 40-560 — Fee-in-lieu of sidewalk construction eligibility; fee established
Houston Code of Ordinances (Supp. No. 93, Update 2: codified through Ordinance No. 2026-0732, adopted Aug. 19, 2026) · Houston Code of Ordinances § 40-560
Corpus is an independent public-information project, not the official City of Houston website. Stable reference: corpuslaw.us/code/b6dff9f0-96a5-4992-a7ae-7f63d9af90b0
Sec. 40-560. - Fee-in-lieu of sidewalk construction eligibility; fee established.
(a) The planning official and sidewalk committee may waive the sidewalk construction requirement only in accordance with this section. An applicant must file a sidewalk plan with the department and pay the application fee for the plan review and fee-in-lieu determination. (b) An applicant may request approval to pay a fee-in-lieu of sidewalk construction when either: (1) The planning official determines the activity listed under section 40-553 meets the following conditions: a. Construction of a new single-family residential use, other than a secondary dwelling unit; b. The lot was not created by a subdivision plat submitted after October 1, 2020; c. The lot fronts a local street that is not a walkable place street or TOD street; d. The lot is not a corner lot at an intersection of two or more public streets; e. The lot makes up 20% or less of the linear length of the blockface; f. The lot is on a blockface where no existing sidewalk is located, or no existing sidewalk is located within 500 feet of the lot along the same blockface; and g. There is no school located on the same block as the project site. (2) If the request does not meet the conditions for approval by the planning official, the applicant may request the sidewalk committee to authorize a fee-in-lieu of sidewalk construction pursuant to section 40-561; (c) Upon authorization for payment of the fee-in-lieu of sidewalk construction, the applicant shall deposit the funds with the city as part of the permitting process. All fees collected in accordance with this division shall be deposited into the sidewalk fund. The planning official shall: (1) Maintain a list of approved fee-in-lieu of sidewalk construction projects along with the name and mailing address of the applicant; and (2) Complete an annual evaluation in coordination with the city engineer on the city's total cost per square footage to construct a typical new sidewalk for a construction project funded by the sidewalk fund. (d) The amount of the fee-in-lieu of sidewalk construction shall be included in the city fee schedule, shall be computed on a square foot basis of the cost of materials and labor, and shall be determined by the city engineer on an annual basis to be in place by January 1 of each year, and is not subject to the Annual CPI-U Adjustment under section 1-13 of this Code. The total fee due for a fee-in-lieu of sidewalk construction shall be determined based on the square footage of the sidewalk the applicant would have otherwise been required to construct under this article.
(Ord. No. 2023-58, § 2(Exh. A), 1-25-2023, eff. 3-1-2023)
Ask a question about Houston law
Corpus searches the Houston sections it holds and shows the ones that match, with their citations. Free, no sign-in.