§ 44-278 — Conditions of public rights-of-way occupancy
Code of Ordinances, City of Round Rock, Texas (Supp. 27: codified through Ordinance of August 13, 2026 (online updated November 5, 2026)) · Round Rock Code of Ordinances § 44-278
Corpus is an independent public-information project, not the official City of Round Rock website. Stable reference: corpuslaw.us/code/b70b4126-c447-457a-969d-54167f4a9bba
Sec. 44-278. - Conditions of public rights-of-way occupancy.
(a) In the exercise of governmental functions, the city has first priority over all other users of the public rights-of-way. To the fullest extent allowed by law, the city reserves the right to: (1) Lay sewer, gas, water facilities, and any other pipe lines or cables and conduits; (2) Do underground and overhead work, including attachments; (3) Require restructuring or changes in the city's aerial facilities in, across, along, over or under a public street, alley or public rights-of-way that may be occupied by a utility company; and (4) Change the curb, route or grade of sidewalks and streets. (b) The city shall assign the location in or over the public rights-of-way among competing users of the public rights-of-way with due consideration to the public health and safety considerations of each user type, and to the extent the city can demonstrate that there is limited space available for additional users, may limit new users as allowed under state or federal law. As a priority, each user of the public rights-of-way will be allowed one alignment on one side of the street for placement of its facilities, provided there is adequate space available. In the event an additional alignment or both sides of the street has been requested by a user, the director will grant such request, provided there is adequate space available and the requestor has demonstrated the financial or technical impracticability of the use of the requestor's single alignment or use of only one side of the street. (c) If the city authorizes abutting landowners to occupy space under the surface of any public street, alley, or public rights-of-way, the grant to an abutting landowner shall be subject to the rights of the previously authorized user of the public rights-of-way. (d) If the director gives written notice, the utility company shall, at its own expense (unless provided otherwise by state law or a franchise), temporarily or permanently remove, relocate, change or alter the position of the utility company's facilities that are in the public rights-of-way within 120 days, except in circumstances that require additional time as reasonably determined by the city based upon information provided by the utility company. For projects expected to take longer than 120 days to remove, relocate, change or alter, the director will confer with the utility company before determining the alterations to be required and the timing thereof. The director shall give notice whenever the city has determined that removal, relocation, change or alteration is reasonably necessary for the construction, operation, repair, maintenance or installation of a city governmental public improvement in the public rights-of-way. This article shall not be construed to prevent a utility company's recovery of the cost of relocation or removal from private third parties who initiate the request for relocation or removal, nor shall relocation or removal be required if improvements are solely for beautification purposes without prior joint deliberation and agreement with the utility company. (e) If the utility company fails to relocate facilities in the time required by the director in this article, the utility company shall be subject to liability to the city for such delay. In addition, the city may relocate the utility company's facilities after providing reasonable notice to the affected utility company. Upon receipt of an invoice from the city, the utility company shall reimburse the city for all costs incurred by the city for such relocation within 30 calendar days from the date of the city invoice. (f) Notwithstanding anything in subsection (d) of this section, the director and the utility company may agree in writing to different time frames than those provided above if circumstances reasonably warrant such a change. (g) A utility company may trim trees or other vegetation in or over the public rights-of-way as needed for the safe and reliable operation, use and maintenance of its facilities. All tree trimming shall be performed in accordance with the city's tree protection and preservation ordinance, as amended. The utility company, its contractor or agent, shall remove such trimmings within 72 hours following routine maintenance or within ten business days following emergency activities. If the utility company fails to remove all debris resulting from trimming trees or other vegetation, the city may notify the utility company of such failure. If the utility company fails to remove such debris within five business days from receipt of notice from the city, the city may remove the debris or have it removed, and upon receipt of a bill from the city, the utility company shall reimburse the city for all costs incurred within 30 working days. (h) A utility company shall temporarily remove, raise or lower its aerial facilities to permit the moving of houses or other bulky objects. The utility company shall meet with the party or parties requesting the temporary rearrangement within 72 hours of receipt of notice from the city to discuss the scheduling and cost. The expense of these temporary rearrangements shall be paid by the party or parties requesting and benefiting from the temporary rearrangements. The utility company may require prepayment or prior posting of a bond from the party requesting the temporary move. (i) In the event a utility company's use of its facilities is discontinued or abandoned, the utility company shall notify the city and thereafter shall forthwith remove its facilities from the public rights-of-way unless specifically permitted to remain, and on the removal thereof shall restore, repair or reconstruct the public rights-of-way where such removal has occurred, to the same condition as existed prior to the removal. In the event of failure, neglect or refusal of the utility company, after 30 days' notice by the director to remove such facilities as directed or repair the public rights-of-way upon removal of its facilities, the city may do such work or cause it to be done, and the reasonable cost thereof as determined by the city shall be paid by the utility company and collection may be made by court action or otherwise. There is a presumption of discontinued use if the facilities or related appurtenances are not used for a period of one year. Such presumption may be rebutted by the utility company by documentation of use or by documentation of future use as a utility company designated as a provider of last resort under V.T.C.A., Utilities Code.
(Ord. No. G-07-09-12-10E1, § I(10.909), 8-9-2007)
Ask a question about Round Rock law
Corpus searches the Round Rock sections it holds and shows the ones that match, with their citations. Free, no sign-in.
