§ 12-5.510 — STANDARDS FOR SURFACE MINING OPERATIONS AND RECLAMATION

Fresno Municipal Code (Supp. No. 55, Update 1 (online June 23, 2026): codified through Ordinance No. 2026-019) · Fresno Municipal Code § 12-5.510

Corpus is an independent public-information project, not the official City of Fresno website. Stable reference: corpuslaw.us/code/b725502c-ab03-4811-a56b-80932fdc30e4

SEC. 12-5.510. - STANDARDS FOR SURFACE MINING OPERATIONS AND RECLAMATION.

Each conditional use permit issued pursuant to this Article shall require the applicant to comply with all of the following conditions, without limitation: A. STATEMENT OF RESPONSIBILITY. Before commencement of an approved mining operation or before commencing reclamation work under an approved Reclamation Plan, a statement, prepared in the form of a Covenant to run with the land, shall be signed by the applicant and the property owner, and shall be notarized to attest that the signatories are the owners of the subject property and have owner authorization to apply for and implement the Reclamation Plan, and that the signatories and their successors in interest accept responsibility for reclaiming and maintaining the mined lands in accordance with the approved Reclamation Plan. After final approval of the Reclamation Plan, this statement shall be recorded at the Fresno County Recorder's Office, together with a copy of the applicable Planning Commission or City Council Resolution approving the Reclamation Plan and any Mining Permit for the subject property. B. Standards for surface mining operations: 1. Extraction operations shall comply with all applicable regulations issued by the local, regional, state, and federal agencies. The operator shall file any notices, and obtain any permits, required by local, regional, state, and federal agencies which regulate activities incident to surface mining, mineral processing, and related activities on the site. 2. Surface mining operations and related mineral processing shall not be conducted less than: a. Fifty feet (50′) from any vehicular or pedestrian right-of-way, from the San Joaquin Bluff Toe, or from the property line of any residential use, recreational use (including golf course), or land approved for public assemblage use; or b. Twenty-five feet (25′) from the property line of any adjacent land having uses other than those listed in subparagraph (a) above. 3. Final slopes of excavated or filled areas shall not be steeper than 2:1 (two feet horizontal to one foot vertical) for areas that will not be associated with future public access to open water bodies, and shall not be steeper than 3:1 for areas that will be associated with future public access to open water bodies. The measurement of slopes shall commence at the setback specified above in subparagraph (b) and shall extend to a depth of at least five feet (5′) below the estimated average water level of any ponds. Steeper slopes may be created in the conduct of excavation for limited periods prior to backfilling to final slope requirements, but no temporary slope shall be steeper than one foot horizontal to one foot vertical. 4. Ground or fill beneath any structures, equipment, or roadways shall have sufficient compaction to support the structures, equipment, or vehicles. 5. Critical and sensitive habitat areas shall be preserved and separated from extraction, processing, and stockpiling activities, and from haul roads, by at least one hundred feet (100′). 6. All reasonable and practical measures shall be taken to protect fish and wildlife and to preserve wildlife corridors. 7. Mature forest plant communities, as delineated in the biological assessment submitted pursuant to subsection 12-5.509-C-7.a(3) of this Code, shall be preserved. Extraction, processing, haul roads, and stockpiling activities conducted adjacent to such forest areas shall be set back twice the drip line distance from tree trunks, or a minimum of twenty-five feet (25′), whichever is greater. 8. Disturbance of vegetation and overburden in advance of mining activities shall be minimized. 9. Topsoil, as defined in Section 3501 of SMARA Regulations, shall not be sold from the site. Topsoil and other overburden shall be stockpiled, protected from erosion, and utilized to implement the site's approved Reclamation Plan. 10. Piles of overburden, stockpiled minerals, and mining waste shall be stabilized against erosion. Berms and swales of this material shall not be constructed perpendicular to the flow of a river or stream, but shall be generally parallel or angled toward the direction of downstream flow. 11. No liquid waste, putrescible or non-putrescible solid waste (such as trash, refuse, construction waste), hazardous material, or toxic material may be disposed of on mined lands, buried on mined lands, or used as fill material on mined lands, whether or not it constitutes mining waste as defined in Section 12-5.503-B of this Code. This subsection shall not prohibit the use of compost for revegetation, if such use is approved as part of the reclamation plan. 12. All mining operations shall comply with the City's flood hazard regulations. 13. Mining operations, including construction of bridges, causeways, and other access routes, shall not be allowed within Designated Floodways, unless specifically authorized by the appropriate State agencies such as the California Board of Reclamation and the State Lands Commission. Full disclosure of permit terms and restrictions related to such work shall be included in the Mining Permit. 14. Mining shall not be permitted within flowing streams. Temporary stream or watershed diversions may be allowed through permits issued by the U.S. Army Corps of Engineers and the California Department of Fish & Game. Specific mitigating measures shall be implemented to prevent erosion and to maintain passages for fish and wildlife. Any such temporary diversions shall be restored, in a manner consistent with the Reclamation Plan as soon as practicable. 15. Mining operations conducted adjacent to any flowing stream shall be separated from the stream by closed dikes able to hold back normal seasonal flows of the stream. 16. All water utilized in mining operations and mineral processing, and all runoff from the mine site, shall be contained behind a closed dike so as not to impair water quality in any river, stream, or pond. Such retention and mine waste disposal shall conform to the requirements of local, regional, state, and federal agencies. 17. Ponds (other than those being used to dispose of mining waste) which are created by mining shall be separated from the Designated Floodway. Where feasible and advisable, such ponds may be connected to flowing water (a stream or river) in order to provide circulation and prevent eutrophication, pursuant to an approved water rights application. Pond connections to a stream or river shall not conflict with floodplain management objectives, fisheries resource management objectives, or other water management objectives as established by responsible and trustee agencies. Any fish barriers installed in pond connections shall require hydrological and biological studies to document efficacy and assure avoidance of adverse effects. 18. All reasonable and practical measures shall be employed to protect groundwater quality. 19. Roadside and perimeter vegetation and setbacks shall be maintained sufficient to obscure mining operations and stockpiled overburden and minerals from public view at grade level of the site perimeter. 20. All access to surface mining operations shall only be allowed via public streets that are rated for the truck weights associated with surface mining and related activities. 21. Access roads to and within the site shall be located in a manner that minimizes traffic impacts on surrounding streets and land uses. 22. Access roads to and within the site shall be constructed and maintained so as to control the generation of dust, pursuant to Air Pollution Control District regulations. Dust control measures include frequent watering, wet sweeping, paving, or use of a sealant approved by the Air Pollution Control District, Regional Water Quality Control Board, and the Department of Fish & Game for use at the mine site. 23. Equipment used for surface mining operations and related mineral processing activities shall, as far as practicable, be located and constructed so as to eliminate dust, noise, vibration and visual blight which would affect residential uses in the vicinity. 24. The hours of operation for mining and mineral processing activity shall be limited as necessary to conform to the City's Noise Ordinance, shall conform to subsection 12-5.510-B-30 of this Code, and may be further restricted to minimize impacts on surrounding land uses and public rights-of-way. 25. Within ninety (90) days after final approval of the Mining Permit, and continuously thereafter, the perimeter of mined lands shall be posted with signs not less than three hundred feet (300′) apart and posted at each change of direction of the perimeter line, to give notice in letters not less than four inches in height, that the site is a "SURFACE MINING AREA," and stating in letters not less than two inches in height, "WARNING: This is a DANGEROUS excavation site. Heavy equipment, unstable slopes, loose piles of earth, noise, and dust may present hazards." The operator may add "No Trespassing" language to these signs, in accordance with laws regarding trespass. 26. All night lighting shall be arranged and controlled on the property so as to not illuminate nearby vegetation, public rights-of-way or adjacent properties. 27. Security fencing shall be erected and maintained around extraction sites as necessary to minimize to the greatest extent practicable any attractive nuisance hazards. At least one main gate of mined lands shall be equipped with a lock that provides for emergency fire and police access. 28. Any traffic control or warning signs or devices required by the Department through the special permit conditions or note on approved site plans shall be installed and maintained by the operator. 29. Mining, mineral processing, and hauling operations shall conform to the City's General Plan Noise Element and Noise Ordinance, Chapter 8, Article 3 of this Code. 30. If located within five hundred feet (500′) of the property lines of land with residential uses, mineral processing equipment shall only be operated between the hours of 7:00 a.m. and 7:00 p.m., or during more restricted hours as set by the conditional use permit. Otherwise, mineral processing equipment may be operated between 5:00 a.m. and 10:00 p.m. 31. REPORTING. The Mining Permit shall include the express requirement that operators file the following reports with the DOC Director or his/her designee and a copy of the report to the City. a. Reports shall be made on the form(s) furnished or prescribed by the SMGB. b. Reports shall be accompanied by the applicable filing fee and a copy of the City's annual inspection report, as specified in SMARA Section 2207. c. New mining operations shall file an initial report with the DOC Director or his/her designee within thirty (30) days of final conditional use permit approval or before commencement of operations, whichever is sooner. d. All operators shall file an annual report on or before the date established by the DOC. 32. The conditional use permit shall include provisions for providing access to mined lands by the City and DOC personnel, for periodic and other inspections of the site. C. Standards for Reclamation and Interim Management Plans: 1. Reclamation Plans shall comply with SMARA and SMARA Regulations. 2. End uses of reclaimed mine sites shall be consistent with adopted City of Fresno plans and policies. a. End uses shall be consistent with the General Plan, community plan, and specific plan land use designation(s) and policies applicable to the site. b. End uses shall not preclude approved uses of adjacent property including the extraction of minerals from such property. End uses shall reflect terms and conditions of pre-existing entitlements and applicable previously approved mitigation programs. c. Whenever possible, reclamation should be planned to have multiple benefits, in it should support the stated end use of the property, while enhancing or complementing the natural resources of the area and/or allowing for recreational opportunities. It shall be recognized that habitat enhancement, scenic value improvement, and recreational use, should complement, not prohibit, permitted end uses of reclaimed lands. d. End uses shall be consistent with flood control and safety regulations and objectives. 3. Reclamation activities shall be initiated at the earliest possible time on those portions of mined lands that will not be subject to further disturbance. Reclamation of mined lands or a delineated phase of mining shall not begin later than six months after the cessation of mining on those mined lands or delineated phase area. 4. Reclamation activity shall be coordinated with seasonal weather patterns in order to prevent erosion and maximize success of revegetation. 5. Final slopes of excavated or filled areas shall not be steeper than 2:1 (two feet horizontal to one foot vertical) at any point for areas that will not be associated with future public access to open water bodies, and shall not be steeper than 3:1 at any point for areas that will be associated with future public access to open water bodies. These limits on slopes shall extend to a depth of at least five feet (5′) below the estimated average water level of any ponds created by mining activity. 6. Grading, erosion control measures, and revegetation plantings shall be designed to prevent excessive erosion or subsidence, and designed to control surface runoff according to: a. The City's drainage regulations as set forth in Section 13-120.3315 et seq. of this Code; b. Compaction standards adequate to support any new structures or roads/access routes to be constructed as part of reclamation; and c. Applicable best management practices for stormwater management. 7. Piles or dumps of mining waste and overburden shall be stabilized to prevent erosion, and all toxic materials shall be removed or rendered inert to prevent leaching. 8. Access roads, haul roads, and parking areas shall be removed unless the Reclamation Plan specifically authorizes their retention to implement or support the end use of the mined lands. In order to erase the roads, concrete, asphalt, wood and metal parts shall be removed and recycled; road beds shall be ripped to reverse compaction; topsoil or other suitable growing medium shall be placed on the road bed; and the area shall be revegetated. 9. Bridges, causeways, or other overcrossings may be retained for incorporation into a trail or road network as authorized by area plans, if all necessary approvals to retain such structures are obtained. 10. Bridge structures, causeways, and other overcrossing structures that are not to remain to support the approved reclamation use(s) of the property, that present a hazard to River users, or that impede flood waters, shall be removed as soon as possible after their use in mining operations has ceased. All portions of the structures shall be removed, including culvert pipes and fill. 11. Water features that are created by mining activities and will remain as part of the site's reclaimed use shall be designed with the following criteria: a. The margins of water features shall have stepped benches with level areas of varying widths at intervals of a few feet below and above the expected water level. The slope between benches shall not exceed criteria set forth in this Article or the approved plan. b. Shorelines shall be scalloped to form an irregular land/water interface; c. Extended peninsulas and islands should be created whenever feasible; and 12. Ponds may be (or may remain) connected to a stream or river, provided the provisions of subsection 12-5.10-B-17 of this Code are complied with. 13. Revegetation shall be consistent with the designated end use of the mined lands and shall be designed to maximize success of the plantings. a. Where the specified end use does not call for certain plantings, revegetation shall employ native species endemic to the vicinity. b. For mined lands whose end use(s) involve habitat improvement, revegetation shall make the site more useful for supporting wildlife by providing cover and food. c. Vegetative species-richness, density, and canopy/cover for areas being restored with native plants shall be similar to naturally-occurring vegetation on the site prior to mining or in surrounding undisturbed areas with similar terrain and water availability. d. Where possible and feasible, propagules (seeds, cuttings, root divisions) of native plants to be used for revegetation should be gathered from the site or from adjacent lands. Any required permits and permissions shall be obtained for the collection of source plants. Collection efforts shall not destroy or materially injure sources of native plants. e. In riparian areas, plantings should be generally designed to provide multiple, braided bands of cover parallel to the adjacent stream or river, with some clumps for diversity and denser cover. f. Establishment of native vegetation for habitat on mined lands shall be planned. and designed to eventually be self-supporting and to have self-regeneration and ecological succession capability without continued dependence on irrigation or other intensive management practices. g. Where the prospective success of a proposed revegetation plan cannot be documented by previous experience or assured by professional advice, test plots may be required by the Development Department and/or DOC. Results obtained from test plots may be employed to alter the specifications of the revegetation plan. h. The Reclamation Plan and financial assurance shall provide for maintaining and replacing revegetation plantings throughout the establishment and post-reclamation maintenance period, until the plantings become well enough established to survive. i. Planting periods shall relate to the species and the type of propagule being used. Flexibility will be allowed in planting schedules for suitability of precipitation and temperature, in order to provide for optimal establishment of plants; however, erosion control goals shall also be considered. j. The revegetation plan schedule, objectives, and success benchmarks shall be consistent with the Reclamation Plan revegetation evaluation criteria as set forth in the monitoring plan required under subsection 12-5.509-D-14 of this Code. 13. FINANCIAL ASSURANCE. To ensure that reclamation will proceed in accordance with the approved Reclamation Plan, the City shall require security which will be released upon satisfactory performance and the expiration of any maintenance periods. Final approval of a Reclamation Plan and, therefore, of a Mining Permit, requires acceptance and approval of financial assurance as specified below. a. Financial assurance will be required to ensure compliance with elements of the Reclamation Plan, including but not limited to: (1) Grading and stabilization of slopes and piles, erosion control, and drainage improvements; (2) Removal of equipment, structures, haul roads, access roads, bridges, causeways, and other improvements; (3) Restoration and preservation of water bodies, including contouring; (4) Protection of surface and ground water quality; (5) Revegetation and landscaping, including soil amendment, installation and operation of irrigation systems, and maintenance of plantings; (6) Restoration or improvement of aquatic or wildlife habitat; (7) Securing of the site to prevent unauthorized entry; (8) Two years of inspection fees for the entire site; (9) Disposal of any hazardous materials; and (10) Other measures and site improvements, as necessary to implement the approved Reclamation Plan. b. The amount of the financial assurance shall be arrived at pursuant to the following guidelines: (1) Cost estimates should be prepared by a California registered Professional Engineer, Registered Geologist, and/or other similarly licensed and/or qualified professional retained by the operator. (2) The estimated amount of the financial assurance shall be based on an analysis of physical activities necessary to implement the approved Reclamation Plan, the unit costs for each of these activities, the number of units of each of these activities, plus actual administrative costs. (3) Financial assurance for revegetation, restoration of water bodies, restoration of aquatic or wildlife habitat, and any other applicable element of the approved Reclamation Plan shall be based upon cost estimates that include but may not be limited to labor, equipment, mobilization of equipment, supplies and materials, disposal costs including those related to any hazardous materials, administration (including two years of City inspection fees), and reasonable profit for a licensed contractor other than the operator to do the work. In projecting the costs of financial assurance, it shall be assumed without prejudice or insinuation that the surface mining operation could be abandoned by the operator and, consequently, the City or DOC may need to contract with a third party commercial company for reclamation of the site. (4) A contingency factor of ten percent (10%) shall be added to the cost of financial assurance. (5) The financial assurance shall cover the cost of reclaiming existing disturbed areas, any required interim reclamation, and reclamation of those areas subject to anticipated activities for the next calendar year, excepting that the operator may not claim credit for reclamation scheduled or anticipated to be completed during the coming year. (6) Cost estimates for reclamation of a phase of mining shall take into account the concomitant disturbance on other portions of mined lands. It shall be based upon mining, on-site processing, and reclamation activities associated with that phase of mining as delineated in the approved mining permit and Reclamation Plan, and shall include required maintenance of reclaimed areas. Cost estimates are subject to adjustment for the actual cost of reclaiming lands to be disturbed by surface mining activities in the upcoming year. (7) The amount of financial assurance required of a surface mining operation for any one year shall be adjusted annually to account for new lands disturbed by surface mining operations, any interim reclamation activities, inflation, and reclamation already accomplished in accordance with the approved Reclamation Plan. (8) Revisions to financial assurance shall be submitted to the Development Department each year prior to the anniversary date for approval of the financial assurance. If revisions to the financial assurance are not required, the operator shall explain, in writing, why revisions are not required. c. Cost estimates for the financial assurance shall be submitted to the Development Department for review and approval prior to the applicant/operator preparing or securing financial assurance instruments. d. The Development Department shall forward a copy of the cost estimates, any documentation received supporting the amount of the cost estimates, and a copy of the proposed or conceptually approved Reclamation Plan, to the DOC Director for review. If the DOC Director does not comment within forty-five (45) days of receipt of these estimates, it shall be assumed that the cost estimates are adequate, unless the City has reason to determine that additional costs may be incurred. e. Once the cost estimates for reclamation are approved, the applicant/operator may pose security in the form of a cash deposit, certificate of deposit, trust fund, surety bond from a bonding company approved by the City, irrevocable letter of credit from an accredited financial institution, or alternate method and form as may be acceptable to the City Attorney and to the SMGB and DOC as specified in State regulations. The financial security shall be in an amount equal to the estimated cost of completing reclamation activity pursuant to the approved Reclamation Plan within a reasonable time period, as determined by the Development Department) plus the cost of post-reclamation maintenance and related administrative needs such as inspections. Financial security instruments shall be made payable to the "City of Fresno" and the "California Department of Conservation." f. Financial assurance for each phase of reclamation shall remain in effect for the duration of the surface mining operation and any additional time, until that phase of reclamation is completed and accepted as complete by the City and there have been at least five years of post-reclamation maintenance of that completed and accepted phase of reclamation. g. Financial assurance shall be maintained for idle surface mining operations as though the operations were active. 14. Interim Management Plans shall have the following requirements: a. The Interim Management Plan shall provide measures the operator will implement to maintain the site in a secure and stable condition with regard to public health and safety. b. The Interim Management Plan shall provide measures the operator will implement to maintain the site in compliance with SMARA, SMARA Regulations, and this Article. c. Financial assurance shall be maintained as through the surface mining operation were active. d. The Interim Management Plan may be approved to remain in effect for a period not to exceed five years, at which time the following actions shall be taken: (1) The Development Department shall determine, based on inspections, whether the operator has complied fully with the Interim Management Plan; (2) Upon application by the operator, the Planning Commission may renew the Interim Management Plan for another period not to exceed five years; unless the operator does not apply for an extension, or there is evidence that the Interim Management Plan has not been implemented by the operator, in which cases the Planning Commission shall require the operator to commence reclamation in accordance with the approved Reclamation Plan for the site. e. At the expiration of a renewed Interim Management Plan, the operator shall be required to commence reclamation pursuant to the approved Reclamation Plan. f. Nothing in this Section shall preclude the City or the DOC from taking enforcement action against the operator and/or property owner to require reclamation of, or to reclaim, an idled mine site or abandoned mine site if inspections reveal that interim management is not protecting public health and safety, not securing the site, not stabilizing the site, or if the Operator is not complying with reporting and/or financial security requirements. (Added Ord. 99-37, § 7, 7-9-99).